Implementation and operation of a CCGT power plant for a chemical plant - How to cover special steam conditions

被引:0
|
作者
Bercsi, Gabor
Czibere, Zsolt
Varga, Viktor
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
TVK, as one of the leader companies of chemical industry in Central-Europe, in 2000 decided to place their heat and electricity supply on new bases. The long term steam supply from Power Plant Tiszapalkonya seemed to be not secured due to restricted environmental regulation. TVK intended to extend its polyolefin production facility which has increased the steam demand. TVK decided to construct a boiler plant/power plant with the following requirements: (.) long-term, secure and economical steam supply meeting the entire steam demand of TVK supplied from a source other than its own, (.) an acceptable time frame for the implementation and the development of the project, (.) the lowest possible capital requirement (involvement of a professional investor), (.) in the case of electricity generation, it may only be carried out through cogeneration with heat, with the minimization of condensing electricity generation, with regard to the process of the opening of the electricity market. The power plant project has been realized through a project company established by TVK and North Hungarian Electricity Distribution Co. where the chemical company has 26 %, the professional investor has 74 % ownership. The construction of the power plant started at the beginning of 2002 and finished in 2004. The installed steam capacity of the project is 250 t/h the power output is 35 MW. The plant has been delivered by Siemens - Transelektro consortia based on turn-key EPC Contract. The plant consists of a Siemens SGT 600 (former GT10B) gas turbine with supplementary fired HRSG and a Siemens ST-6 steam turbine and three auxiliary boilers with 65 t/h steam capacity each. The paper to be presented shows the decision making process concerning the power plant investment. It describes the technical scheme of the project and outlines the special technical features of the steam supply arising from the unusual steam load of TVK especially during start-up, shut-down and forced outages of the olefin plants which requires high additional steam supply in short time. It shows the experiences of the first year of operation too, how the plant has been able to fulfill its design criteria.
引用
收藏
页码:633 / 639
页数:7
相关论文
共 50 条
  • [21] Performance analysis of a CCGT power plant integrated to a LNG regasification process
    Stradioto, Diogo Angelo
    Seelig, Marina Fonseca
    Schneider, Paulo Smith
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2015, 23 : 112 - 117
  • [22] Reprint of: Performance analysis of a CCGT power plant integrated to a LNG regasification process
    Stradioto, Diogo Angelo
    Seelig, Marina Fonseca
    Schneider, Paulo Smith
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2015, 27 : 18 - 22
  • [23] Implementation of an Industry 4.0 system to optimally manage chemical plant operation
    Vaccari, Marco
    di Capaci, Riccardo Bacci
    Brunazzi, Elisabetta
    Tognotti, Leonardo
    Pierno, Paolo
    Vagheggi, Roberto
    Pannocchia, Gabriele
    IFAC PAPERSONLINE, 2020, 53 (02): : 11545 - 11550
  • [24] Effect of Low Pressure End Conditions on Steam Power Plant Performance
    Ali, Syed Haider
    Baheta, Aklilu Tesfamichael
    Hassan, Suhaimi
    ICPER 2014 - 4TH INTERNATIONAL CONFERENCE ON PRODUCTION, ENERGY AND RELIABILITY, 2014, 13
  • [25] STABLE OPERATION MODE DISCUSSION ON STEAM STORAGE TECHNOLOGY IN SOLAR POWER PLANT
    Shen, Guoqing
    Lv, Yongxing
    Lv, Tai
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [26] Optimized operation of a cooling pond tower system for a steam cycle power plant
    Beckman, WA
    Mitchell, JW
    Kirchhoff, J
    PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL 59, I AND II, 1997, 59 : 962 - 967
  • [27] Exergy analysis of a steam power plant at full and partial load conditions
    Azubuike, Uchenna G.
    Egbuhuzor, Linus C.
    Njoku, Howard O.
    Ekechukwu, Onyemaechi V.
    INTERNATIONAL JOURNAL OF EXERGY, 2023, 40 (02) : 182 - 197
  • [28] Optimized operation of a cooling pond tower system for a steam cycle power plant
    Beckman, WA
    Mitchell, JW
    Kirchoff, J
    PROCEEDINGS OF THE AMERICAN POWER CONFERENCE, VOL 59 - PTS I AND II, 1997, 59 : 962 - 967
  • [29] Improving the Quality of Intermittent Wind Power and its Harvest for Steam Power Plant Operation on Power Systems
    Hassan, Aliyu
    Hamam, Yskandar
    Munda, Josiah L.
    2020 5TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGIES FOR DEVELOPING COUNTRIES (REDEC), 2020,
  • [30] Research on synchronous optimization of steam power system for processing units and thermal power plant operation
    Zhao H.
    Zhu W.
    Ye H.
    Dong H.
    Huagong Jinzhan/Chemical Industry and Engineering Progress, 2022, 41 : 44 - 53