Economic Optimization of Dual Mixed Refrigerant Liquefied Natural Gas Plant Considering Natural Gas Extraction Rate

被引:43
|
作者
Lee, Inkyu [1 ]
Moon, Il [1 ]
机构
[1] Yonsei Univ, Dept Chem & Biomol Engn, 50 Yonsei ro, Seoul 03722, South Korea
关键词
LIQUEFACTION PROCESS; CASCADE REFRIGERATION; LNG; DESIGN; ENERGY; OPERATION; SELECTION; CYCLE;
D O I
10.1021/acs.iecr.6b04124
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This study mainly focuses on the profit optimization of the natural gas liquefaction process considering extraction rate. The target process is the dual mixed refrigerant (DMR) process with 1 million tons per annum (MTPA) capacity. The liquefaction ratio and the amount of boil-off gas (BOG) varies according to the natural gas extraction rate to meet the liquefaction capacity. Therefore, utilizing produced BOG and minimizing wasted BOG is key from an economic point of view. This study performed profit optimization with various extraction rates. Moreover, the energy and cost optimizations are performed to analyze the extraction rate effect. As results for the profit maximization, the total compression energy requirement and the plant cost show optimum values between the energy and cost optimization results. The profit increases by 22.5% with 93.2% liquefaction ratio through the optimization. The result shows that producing BOG as the amount of the fuel requirement for the compression energy supply is the optimal extraction rate. Resultingly, the optimal design of the profit max DMR process is also found through the profit optimization.
引用
收藏
页码:2804 / 2814
页数:11
相关论文
共 50 条
  • [41] Dynamic simulation and optimization of the operation of boil-off gas compressors in a liquefied natural gas gasification plant
    Jang, Namjin
    Shin, Myoung Wook
    Choi, Soo Hyoung
    Yoon, En Sup
    KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2011, 28 (05) : 1166 - 1171
  • [42] Compressed natural gas (CNG): An alternative to liquefied natural gas (LNG)
    Cullen College of Engineering, U. of Houston, Houston, TX, United States
    不详
    不详
    不详
    SPE Prod. Oper., 2006, 2 (318-324):
  • [43] Natural gas liquids (NGL) recovery in the liquefied natural gas production
    Wang, Mengyu
    Abbas, Ali
    26TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT A, 2016, 38A : 1207 - 1212
  • [44] Compressed natural gas (CNG): An alternative to liquefied natural gas (LNG)
    Economides, Michael J.
    Sun, Kai
    Subero, Gloria
    SPE PRODUCTION & OPERATIONS, 2006, 21 (02): : 318 - 324
  • [45] Conversion of a beverage container plant from liquefied to natural gas
    Runkel, Hans
    Hartemink, Dieter
    Gaswaerme International, 2000, 49 (12): : 635 - 638
  • [46] OPERATING HISTORY OF ARUN LIQUEFIED NATURAL-GAS PLANT
    OEKON, JR
    SUYANTO
    JOURNAL OF PETROLEUM TECHNOLOGY, 1985, 37 (05): : 863 - 867
  • [47] Spot Charter Rate Forecast for Liquefied Natural Gas Carriers
    Lyridis, Dimitrios, V
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (09)
  • [48] Natural gas treatment by membrane-case study of liquefied natural gas plant of Arzew-Algeria
    Mezouagh, Amina
    Absar, Belkacem
    Maamar, Maghnia Hamou
    Belhamiti, Omar
    INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2021, 28 (01) : 52 - 79
  • [49] Optimization of recirculation operating in liquefied natural gas receiving terminal
    Park, Chansaem
    Lee, Chul-Jin
    Lim, Youngsub
    Lee, Sangho
    Han, Chonghun
    JOURNAL OF THE TAIWAN INSTITUTE OF CHEMICAL ENGINEERS, 2010, 41 (04) : 482 - 491
  • [50] Design and optimization of offshore natural gas liquefaction processes adopting PLNG (pressurized liquefied natural gas) technology
    Xiong, Xiaojun
    Lin, Wensheng
    Gu, Anzhong
    JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING, 2016, 30 : 379 - 387