A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing

被引:16
|
作者
Van den Eeckhout, M. [1 ]
Vanhoucke, M. [1 ,2 ,3 ]
Maenhout, B. [1 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, Tweekerkenstr 2, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Technol & Operat Management Area, Ghent, Belgium
[3] UCL, UCL Sch Management, London, England
关键词
Multi-project scheduling; Personnel staffing; Column generation; Diving heuristic; Resource sharing; BRANCH-AND-PRICE; EMPLOYEE SCHEDULING PROBLEM; MATHEMATICAL-MODEL; NURSING STAFF; ALLOCATION; FLEXIBILITY; ALGORITHM; MOVEMENT; WORKERS; SHIFTS;
D O I
10.1016/j.cor.2020.105163
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Project managers are often responsible for the management of multiple projects and associated personnel budgeting decisions. In order to determine the workforce size and mix accurately, we integrate the multi project scheduling problem and personnel staffing problem. We construct a baseline personnel roster that takes the personnel scheduling constraints into account and model the workload stemming from the project activities as an endogenous variable in the model. In order to decrease the overall staffing budget, we consider the sharing of resources, i.e. personnel resources can be transferred between projects. In the problem under study, we consider unproductive resource transfer times and different restrictions related to the sharing of resources imposed on the schedule of individual workers, which is often neglected in the literature. We propose a multi-stage solution procedure that exploits the optimal linear programming solution, obtained via column generation, to find a high-quality integer solution based on a diving heuristic. In order to improve the computational performance, different speed-up mechanisms are included relying on a state space reduction. Detailed computational experiments are presented to evaluate and benchmark different alternative optimisation strategies. Managerial insights are provided which give insight in the benefits of resource sharing. ? 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:19
相关论文
共 47 条
  • [1] A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
    Van den Eeckhout, M.
    Maenhout, B.
    Vanhoucke, M.
    COMPUTERS & OPERATIONS RESEARCH, 2019, 101 : 144 - 161
  • [2] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [3] A column generation-based heuristic for aircraft recovery problem with airport capacity constraints and maintenance flexibility
    Liang, Zhe
    Xiao, Fan
    Qian, Xiongwen
    Zhou, Lei
    Jin, Xianfei
    Lu, Xuehua
    Karichery, Sureshan
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 113 : 70 - 90
  • [4] A column generation-based heuristic for a rehabilitation patient scheduling and routing problem
    Xiao, Liyang
    Zhen, Lu
    Laporte, Gilbert
    Baldacci, Roberto
    Wang, Chenghao
    COMPUTERS & OPERATIONS RESEARCH, 2022, 148
  • [5] Concurrent resource allocation (CRA): A heuristic for multi-project scheduling with resource constraints in concurrent engineering
    Kara, S
    Kayis, B
    Kaebernick, H
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2001, 9 (01): : 64 - 73
  • [6] A Modified Heuristic Algorithm for Resource Constrained Multi-project Scheduling Problem based on Inspection and Rework
    Zhu, Hongwei
    Lu, Zhiqiang
    Hu, Xinming
    2018 IEEE 14TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2018, : 1058 - 1063
  • [7] A column generation-based heuristic to solve the integrated planning, scheduling, yard allocation and berth allocation problem in bulk ports
    de Andrade, Joao Luiz Marques
    Menezes, Gustavo Campos
    JOURNAL OF HEURISTICS, 2023, 29 (01) : 39 - 76
  • [8] A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP)
    Villafanez, Felix
    Poza, David
    Lopez-Paredes, Adolfo
    Pajares, Javier
    del Olmo, Ricardo
    SOFT COMPUTING, 2019, 23 (10) : 3465 - 3479
  • [9] A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP)
    Félix Villafáñez
    David Poza
    Adolfo López-Paredes
    Javier Pajares
    Ricardo del Olmo
    Soft Computing, 2019, 23 : 3465 - 3479
  • [10] A column generation-based heuristic to solve the integrated planning, scheduling, yard allocation and berth allocation problem in bulk ports
    João Luiz Marques de Andrade
    Gustavo Campos Menezes
    Journal of Heuristics, 2023, 29 : 39 - 76