Impact of surface clogging on artificial recharge

被引:0
|
作者
McAlister, DJ [1 ]
Arunakumaren, J [1 ]
Grantham, T [1 ]
机构
[1] Dept Nat Resources, Indooroopilly, Qld, Australia
来源
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This paper focuses on modelling fluid flow processes in the unsaturated zone beneath surface spreading artificial recharge facilities. A sixty layer model has been developed to simulate flow from a recharge basin through the unsaturated and saturated zones. Clogging of in-situ pore space is the major limiting factor in sustainable artificial recharge operations. Clogging rates have been simulated in the surface layers of the model by a power function. Several model scenarios have been generated with uniform and layered hydraulic conductivity soil media. Results of modelling indicate that the majority of recharge occurs in the initial 6 days after flooding of the basin. After this initial period recharge rates are reduced significantly by clogging. An understanding of these key parameters can help in generating and calibrating accurate numerical models. The data derived from these models can be used in management of artificial recharge operations.
引用
收藏
页码:415 / 420
页数:6
相关论文
共 50 条
  • [41] Impact of artificial recharge on dissolved noble gases in groundwater in California
    Cey, Bradley D.
    Hudson, G. Bryant
    Moran, Jean E.
    Scanlon, Bridget R.
    [J]. ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2008, 42 (04) : 1017 - 1023
  • [42] Proposal for the detection and correction of impacts produced by clogging processes in the Cubeta de Santiuste artificial recharge facilities (Segovia, Spain)
    Fernandez Escalante, E.
    Garcia, J. M.
    Minaya, M. J.
    [J]. BOLETIN GEOLOGICO Y MINERO, 2009, 120 (02): : 215 - 234
  • [43] Issues in artificial recharge
    Bouwer, H
    [J]. WATER SCIENCE AND TECHNOLOGY, 1996, 33 (10-11) : 381 - 390
  • [44] ARTIFICIAL RECHARGE OF GROUNDWATER
    JOHNSON, AI
    [J]. EPISODES, 1994, 17 (03): : 62 - 63
  • [45] Study on physical clogging mechanism of sandstone geothermal tailwater recharge
    Wang, Jianzhong
    Wang, Xiangtao
    Xu, Qingfa
    Tian, Suo
    Huang, Yue
    [J]. WATER SUPPLY, 2022, 22 (12) : 8795 - 8812
  • [46] The effect of manganese(II) on recharge clogging of groundwater heat pump
    Kang, Han
    Gao, Rongyao
    Zang, Chunyue
    Li, Dan
    Wang, Mouwei
    [J]. 2020 5TH INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, ENERGY TECHNOLOGY AND ENVIRONMENTAL ENGINEERING, 2020, 571
  • [47] ARTIFICIAL GROUNDWATER RECHARGE
    JOSEPH, JB
    [J]. WATER SERVICES, 1981, 85 (1024): : 303 - &
  • [48] ARTIFICIAL BASIN RECHARGE
    NIGHTINGALE, HI
    BIANCHI, WC
    [J]. WATER-ENGINEERING & MANAGEMENT, 1981, : 85 - &
  • [49] CLOGGINS IN SURFACE SPREADING OPERATIONS FOR ARTIFICIAL GROUND-WATER RECHARGE
    BEHNKE, JJ
    [J]. WATER RESOURCES RESEARCH, 1969, 5 (04) : 870 - &
  • [50] Artificial recharge with surface water; a pilot project in Wadi Madoneh, Jordan
    de laat, Pieter J. M.
    Nonner, Johannes C.
    [J]. ENVIRONMENTAL EARTH SCIENCES, 2012, 65 (04) : 1251 - 1263