Bottlenecks with respect to due-time performance in pull serial production lines

被引:24
|
作者
Li, JS [1 ]
Meerkov, SM [1 ]
机构
[1] Univ Michigan, Dept Elect Engn & Comp Sci, Ann Arbor, MI 48109 USA
关键词
production systems; due-time performance; bottleneck; blockage; starvation;
D O I
10.1155/S1024123X99001209
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this work, serial production lines with finished goods buffers operating in the pull regime are considered. The machines are assumed to obey Bernoulli reliability model. The problem of satisfying customers demand is addressed. The level of demand satisfaction is quantified by the due-time performance (DTP), which is defined as the probability to ship to the customer a required number of parts during a fixed time interval. Within this scenario, the definitions of DTP bottlenecks are introduced and a method for their identification is developed.
引用
收藏
页码:479 / 498
页数:20
相关论文
共 50 条
  • [31] Integrated Process-System Modeling and Performance Analysis for Serial Production Lines
    Li, Chen
    Chang, Qing
    Xiao, Guoxian
    Arinez, Jorge
    [J]. IEEE ROBOTICS AND AUTOMATION LETTERS, 2022, 7 (03): : 7431 - 7438
  • [32] Performance Analysis based Markov Theory for Hybrid Control Serial Production Lines
    Tang, Ying
    Huang, Min
    Ching, Wai-Ki
    [J]. 2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 2877 - +
  • [33] Performance Analysis of Bernoulli Serial Production Lines with Switch-On/Off Machine Control
    Jia, Zhiyang
    Zhang, Liang
    Arinez, Jorge
    Xiao, Guoxian
    [J]. 2015 INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2015, : 477 - 482
  • [34] Serial production lines with geometric machines and finite production runs: performance analysis and system-theoretic properties
    Jia, Zhiyang
    Zhang, Liang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (08) : 2247 - 2262
  • [35] Raw material release rates to ensure desired production lead time in Bernoulli serial lines
    Biller, Stephan
    Meerkov, Semyon M.
    Yan, Chao-Bo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (14) : 4349 - 4364
  • [36] Real-Time Bottleneck in Serial Production Lines With Bernoulli Machines: Theory and Case Study
    Tu, Jiachen
    Bai, Yishu
    Yang, Mengzhuo
    Zhang, Liang
    Denno, Peter
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (04) : 1822 - 1834
  • [37] Performance Analysis of Bernoulli Serial Lines With Small Batch Production and Machine Switch On/Off Control
    Jia, Zhiyang
    Tian, Xiuxuan
    Wang, Zunjun
    Wang, Gang
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024,
  • [38] Iteration Algorithms for Performance Evaluation and Buffer Design of Bernoulli Serial Lines with Waiting Time Constraints
    Lee, Jun-Ho
    Li, Jingshan
    Horst, John A.
    [J]. 2017 13TH IEEE CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2017, : 654 - 655
  • [39] Performance analysis for serial production lines with Bernoulli Machines and Real-time WIP-based Machine switch-on/off control
    Jia, Zhiyang
    Zhang, Liang
    Arinez, Jorge
    Xiao, Guoxian
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (21) : 6285 - 6301
  • [40] SCHEDULING SINGLE-GRIPPER GANTRY ROBOTS IN TIGHTLY COUPLED SERIAL PRODUCTION LINES - OPTIMUM VS PUSH/PULL CONCEPT BASED SEQUENCES
    CHEN, FF
    SU, Q
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 1995, 14 (03) : 139 - 147