Workflow Level Interoperation of Grid Data Resources

被引:0
|
作者
Kiss, Tamas [1 ]
Kacsuk, Peter [2 ]
Terstyanszky, Gabor [1 ]
Winter, Stephen [1 ]
机构
[1] Univ Westminster, 115 New Cavendish St, London W1W 6UW, England
[2] MTA SZTAKI, Budapest, Hungary
关键词
Grid workflow; interoperation; grid data resources; SRB; OGSA-DAI;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The lack of widely accepted standards and the use of different middleware solutions divide today's Grid resources into non-interoperable production Grid islands. On the other hand, more and more experiments require such a large number of resources that the interoperation of existing production Grids becomes inevitable. This paper, based on the current results of grid interoperation studies, defines generic requirements towards the workflow level interoperation of grid solutions. It concentrates on intra-workflow interoperation of grid data resources, as one of the key areas of generic interoperation, and describes through an example how existing tools can be extended to achieve the required level of interoperation.
引用
收藏
页码:194 / +
页数:3
相关论文
共 50 条
  • [31] Grid security interoperation between CGSP and VEGA
    Zou, Deqing
    Jin, Hai
    Chen, Xueguang
    Han, Zongfen
    PROCEEDINGS OF FUTURE GENERATION COMMUNICATION AND NETWORKING, MAIN CONFERENCE PAPERS, VOL 1, 2007, : 509 - +
  • [32] Facilitating Workflow Interoperation Using Artifact-Centric Hubs
    Hull, Richard
    Narendra, Nanjangud C.
    Nigam, Anil
    SERVICE-ORIENTED COMPUTING - ICSOC 2009, PROCEEDINGS, 2009, 5900 : 1 - 18
  • [33] Pegasus on the Virtual Grid: A Case Study of Workflow Planning over Captive Resources
    Kee, Yang-Suk
    Byun, Eunkyu
    Deelman, Ewa
    Vahi, Karan
    Kim, Jin-Soo
    2008 THIRD WORKSHOP ON WORKFLOWS IN SUPPORT OF LARGE-SCALE SCIENCE (WORKS 2008), 2008, : 51 - 59
  • [34] Modelling and solving grid resource allocation problem with network resources for workflow applications
    Marek Mika
    Grzegorz Waligóra
    Jan Węglarz
    Journal of Scheduling, 2011, 14 : 291 - 306
  • [35] Modelling and solving grid resource allocation problem with network resources for workflow applications
    Mika, Marek
    Waligora, Grzegorz
    Weglarz, Jan
    JOURNAL OF SCHEDULING, 2011, 14 (03) : 291 - 306
  • [36] RESTFul based heterogeneous Geoprocessing workflow interoperation for Sensor Web Service
    Yang, Chao
    Chen, Nengcheng
    Di, Liping
    COMPUTERS & GEOSCIENCES, 2012, 47 : 102 - 110
  • [37] Dealing with semantic interoperation of data
    Mitra, P
    Wiederhold, G
    Decker, S
    LOCAL TO GLOBAL DATA INTEROPERABILITY - CHALLENGES AND TECHNOLOGIES: BEYOND MASS STORAGE TO GLOBALLY DISTRIBUTED DATA, 2005, : 134 - 144
  • [38] Grid workflow scheduling. based on task and data locations
    Wu, YJ
    Gu, N
    Zong, YW
    Ding, ZG
    Zhang, SH
    Zhang, Q
    COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING, PROCEEDINGS, 2005, 3675 : 149 - 156
  • [39] A data mining-based framework for grid workflow management
    Congiusta, A
    Greco, G
    Guzzo, A
    Manco, G
    Pontieri, L
    Saccá, D
    Talia, D
    QSIC 2005: FIFTH INTERNATIONAL CONFERENCE ON QUALITY SOFTWARE, PROCEEDINGS, 2005, : 349 - 356
  • [40] Business-to-business workflow interoperation based on process-views
    Liu, DR
    Shen, MX
    DECISION SUPPORT SYSTEMS, 2004, 38 (03) : 399 - 419