共 50 条
- [32] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1227 - 1239
- [33] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem International Journal of Advanced Manufacturing Technology, 2009, 41 (11-12): : 1227 - 1239
- [34] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1227 - 1239
- [35] Two-Phase Shuffled Frog-Leaping Algorithm 2014 3RD INTERNATIONAL CONFERENCE ON RELIABILITY, INFOCOM TECHNOLOGIES AND OPTIMIZATION (ICRITO) (TRENDS AND FUTURE DIRECTIONS), 2014,
- [37] Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm Soft Computing, 2008, 12 : 435 - 452
- [38] Flow Shop Scheduling Problem with Limited Buffer Based on Hybrid Shuffled Frog Leaping Algorithm PROCEEDINGS OF 2019 IEEE 7TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT 2019), 2019, : 87 - 93
- [39] Improved Shuffled Frog-Leaping Algorithm and Its Application MECHANICAL ENGINEERING AND GREEN MANUFACTURING II, PTS 1 AND 2, 2012, 155-156 : 92 - 96
- [40] Centroid Mutation Embedded Shuffled Frog-Leaping Algorithm PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGIES, ICICT 2014, 2015, 46 : 127 - 134