Considerations in Applying IEEE Recommended Practice for Protection Coordination in Industrial and Commercial Power Systems - Part I

被引:0
|
作者
Mardegan, Claudio S. [1 ]
Rifaat, Rasheek [2 ]
机构
[1] EngePower, Osasco, SP, Brazil
[2] Jacobs Canada, Montreal, PQ, Canada
关键词
Protection Systems; Protection Coordination; ZSI Zone Selective Interlock; Protection; Protective Devices; TCC (time-current curve); Ground Fault; Arcing Fault;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper demonstrates practical considerations when studying Overcurrent Protection Coordination in industrial systems and applying related IEEE Standards. The paper is divided into two parts. Part one focuses on protection coordination for High Voltage and Medium Voltage Industrial Systems. Part two covers balance of distribution system topics. The main discussed subjects are time/chronologic, current/amperometric as well as zone selective interlocking coordination. Other factors that affect coordination are also addressed. Suitable selections of the relay time-current characteristic are presented. The paper also includes practical details for accepted Coordination Time Interval (CTI) in coordinated systems.
引用
收藏
页数:10
相关论文
共 42 条
  • [21] Overview of Changes to IEEE 902, Guide for Maintenance, Operation, and Safety of Industrial and Commercial Power Systems
    Neitzel, Dennis K.
    Simon, Michael E.
    Widup, Ron
    Cook, Carey
    Schuerger, Robert J.
    CONFERENCE RECORD OF 2012 ANNUAL IEEE PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE (PPIC), 2012,
  • [22] AN OVERVIEW OF IEEE 3007 SERIES STANDARDS Addressing the operations, management, maintenance, and safety of industrial and commercial power systems
    Neitzel, Dennis K.
    Simon, Michael E.
    Widup, Ron
    Schuerger, Robert J.
    IEEE INDUSTRY APPLICATIONS MAGAZINE, 2015, 21 (04) : 56 - 60
  • [23] Grounding and ground fault protection of multiple generator installations on medium-voltage industrial and commercial power systems - Part 3: Protection methods working group report
    Pillai, P
    Bailey, BG
    Bowen, J
    Dalke, G
    Douglas, BG
    Fischer, J
    Jones, JR
    Love, DJ
    Mozina, CJ
    Nichols, N
    Normand, C
    Padden, L
    Pierce, A
    Powell, LJ
    Shipp, DD
    Stringer, NT
    Young, RH
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2004, 40 (01) : 24 - 28
  • [24] Grounding and ground fault protection of multiple generator installations on medium-voltage industrial and commercial power systems - Part 1 - The problem defined
    Pillai, P
    Pierce, A
    Bailey, B
    Douglas, B
    Mozina, C
    Normand, C
    Love, D
    Shipp, D
    Dalke, G
    Jones, JR
    Fischer, J
    Bowen, J
    Padden, L
    Powell, L
    Nichols, N
    Young, R
    Stringer, NT
    CONFERENCE RECORD OF THE 2003 ANNUAL PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE, 2003, : 56 - 62
  • [25] Grounding and ground fault protection of multiple generator installations on medium-voltage industrial and commercial power systems - Part 2: Grounding methods
    Pillai, P
    Pierce, A
    Bailey, B
    Douglas, B
    Mozina, C
    Normand, C
    Love, D
    Shipp, D
    Dalke, G
    Jones, JR
    Fischer, J
    Bowen, J
    Padden, L
    Powell, L
    Nichols, N
    Young, R
    Stringer, NT
    CONFERENCE RECORD OF THE 2003 ANNUAL PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE, 2003, : 63 - 70
  • [26] Grounding and ground fault protection of multiple generator installations on medium-voltage industrial and commercial power systems - Part 1 - The problem defined
    Pillai, P
    Bailey, B
    Bowen, J
    Dalke, G
    Douglas, B
    Fischer, J
    Jones, JR
    Love, D
    Mozina, C
    Nichols, N
    Normand, C
    Padden, L
    Pierce, A
    Powell, L
    Shipp, D
    Stringer, NT
    Young, R
    2004 57TH ANNUAL CONFERENCE FOR PROTECTIVE RELAY ENGINEERS, 2004, : 132 - 157
  • [27] Grounding and ground fault protection of multiple generator installations on medium-voltage industrial and commercial power systems - Part 4 - Conclusion and bibliography
    Pillai, P
    Pierce, A
    Bailey, B
    Douglas, B
    Mozina, C
    Normand, C
    Love, D
    Shipp, D
    Dalke, G
    Jones, JR
    Fischer, J
    Bowen, J
    Padden, L
    Powell, L
    Nichols, N
    Young, R
    Stringer, NT
    CONFERENCE RECORD OF THE 2003 ANNUAL PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE, 2003, : 77 - 81
  • [28] Grounding and ground fault protection of multiple generator installations on medium-voltage industrial and commercial power systems - Part 1 - The problem defined
    Pillai, P
    Pierce, A
    Bailey, B
    Douglas, B
    Mozina, C
    Normand, C
    Love, D
    Shipp, D
    Dalke, G
    Jones, JR
    Fischer, J
    Bowen, J
    Padden, L
    Powell, L
    Nichols, N
    Young, R
    Stringer, NT
    CONFERENCE RECORD OF THE 2002 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-4, 2002, : 1881 - 1887
  • [29] Grounding and ground fault protection of multiple generator installations on medium-voltage industrial and commercial power systems - Part 4 - Conclusion and bibliography
    Pillai, P
    Pierce, A
    Bailey, B
    Douglas, B
    Mozina, C
    Normand, C
    Love, D
    Shipp, D
    Dalke, G
    Jones, JR
    Fischer, J
    Bowen, J
    Padden, L
    Powell, L
    Nichols, N
    Young, R
    Stringer, NT
    CONFERENCE RECORD OF THE 2002 IEEE INDUSTRY APPLICATIONS CONFERENCE, VOLS 1-4, 2002, : 1902 - 1906
  • [30] NEUTRAL EARTHING IN HIGH VOLTAGE INDUSTRIAL POWER SYSTEMS - CURRENT SOUTH AFRICAN PRACTICE AND RECOMMENDED STANDARDS.
    Pretorius, R.E.
    Rosen, P.R.
    Transactions of the South African Institute of Electrical Engineers, 1983, 74 (pt 7): : 183 - 190