Evaluation of the risk and benefit of the complementary operation of the large wind-photovoltaic-hydropower system considering forecast uncertainty

被引:74
|
作者
Tan, Qiaofeng [1 ]
Wen, Xin [1 ]
Sun, Yuanliang [1 ]
Lei, Xiaohui [2 ]
Wang, Zhenni [1 ]
Qin, Guanghua [3 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Peoples R China
[2] China Inst Water Resources & Hydropower Res, State Key Lab Simulat & Regulat Water Cycle River, Beijing 100038, Peoples R China
[3] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610065, Peoples R China
基金
国家重点研发计划; 中国国家自然科学基金;
关键词
Hybrid wind-photovoltaic-hydro powers; Hydropower operation; Complementary operation; Cascade reservoirs; Risk and benefit evaluation; RENEWABLE ENERGY-SYSTEMS; POWER-GENERATION; PUMPED-STORAGE; AEGEAN SEA; OPTIMIZATION; FEASIBILITY; ELECTRICITY; ISLAND; WATER;
D O I
10.1016/j.apenergy.2021.116442
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The complementary operation of wind, photovoltaic and hydropower systems has the potential to increase the integration of renewable energy sources into an existing grid. However, the high variability and forecast uncertainty of wind and photovoltaic power may pose potential risks to the grid and cascade reservoirs. In this study, the benefit and risk of the complementary operation of the wind-photovoltaic-hydropower hybrid system are evaluated. First, an optimal day-ahead complementary operation model is proposed to guide the daily operation of the hybrid system. Then, an optimal real-time load allocation model is developed to deal with power generation derivation resulting from the uncertainty of wind and photovoltaic power forecasting. Finally, the benefit and risk of the complementary operation of the wind-photovoltaic-hydropower system are evaluated. A case study is performed with the wind-photovoltaic-hydropower system in the Yalong River basin of China. The results show that (1) the total power generation, the power generation profit, and the utilization efficiency of electricity transmission lines are significantly increased, but the profit of hydropower stations is sacrificed to compensate for wind and photovoltaic power generation; and (2) the negative effect of the variability of wind and photovoltaic power generation on the power grid can be alleviated; (3) reliable power supply can be achieved, and power loss occurs mainly in the flood season and the maximum load loss is acceptable; and (4) it may lead to an increase in release variation, especially in the dry season, and thus flood control gates and hydropower generating units need to be operated more flexibly.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Strategic bidding for a hydro-wind-photovoltaic hybrid system considering the profit beyond forecast time
    Li, Xiao
    Liu, Pan
    Cheng, Lei
    Cheng, Qian
    Zhang, Wei
    Xu, Shitian
    Zheng, Yalian
    RENEWABLE ENERGY, 2023, 204 : 277 - 289
  • [32] Harmonics of the Microinverters for the Operation of the Grid-Connected Photovoltaic Energy System Considering the Uncertainty of Irradiance
    Chura Acero, Julio Fredy
    Beltran Castanon, Norman Jesus
    Yucra, Reynaldo Condori
    Viveros, Henry Pizarro
    Lerma Coaquira, Alex Mario
    PROCEEDINGS OF THE 7TH BRAZILIAN TECHNOLOGY SYMPOSIUM (BTSYM'21): EMERGING TRENDS IN SYSTEMS ENGINEERING MATHEMATICS AND PHYSICAL SCIENCES, VOL 2, 2022, 295 : 688 - 696
  • [33] Economic operation strategy of hydrogen integrated energy system considering uncertainty of photovoltaic output power
    Han Z.
    Li Z.
    Zhang W.
    Liu K.
    Dong H.
    Yuan T.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2021, 41 (10): : 99 - 106
  • [34] Comparative research on the dispatching operation of a hydro-wind-solar-storage complementary system considering configurations with hybrid and pure pumped-storage hydropower plants
    Peng Y.
    Wang X.
    Liu D.
    Li Y.
    Yang Y.
    Xiong Y.
    Chen M.
    Zhong H.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2024, 52 (10): : 179 - 187
  • [35] Hydrothermal System Operation and Transmission Planning Considering Large Wind Farm Connection
    Raby, M.
    Rios, S.
    Jerardino, S.
    Araneda, J. C.
    Raineri, R.
    2009 IEEE BUCHAREST POWERTECH, VOLS 1-5, 2009, : 382 - +
  • [36] Optimal Weekly Operation Scheduling of Pumped Storage Hydropower Plant Considering Optimal Hot Reserve Capacity in a Power System with a Large Penetration of Photovoltaic Generation
    Aihara, Ryota
    Yokoyama, Akihiko
    ELECTRICAL ENGINEERING IN JAPAN, 2016, 195 (02) : 35 - 48
  • [37] Optimal capacity configuration of the hydro-wind-photovoltaic complementary system considering cascade reservoir connection
    He, Yaoyao
    Hong, Xiaoyu
    Wang, Chao
    Qin, Hui
    APPLIED ENERGY, 2023, 352
  • [38] Benefit-stability multi-objective optimal operation of wind-solar-hydropower hybrid system
    Zhang Z.
    Tang H.
    Qin H.
    Luobin
    Zhou C.
    Huang L.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2022, 53 (09): : 1073 - 1082
  • [39] Assessment on capacity credit and complementary benefit of power generation system integrated with wind farm, energy storage system and photovoltaic system
    He, Jun
    Deng, Changhong
    Xu, Qiushi
    Huang, Wentao
    Shu, Zhengyu
    Dianwang Jishu/Power System Technology, 2013, 37 (11): : 3030 - 3036
  • [40] Incorporating Uncertainty of Wind Power Generation Forecast Into Power System Operation, Dispatch, and Unit Commitment Procedures
    Makarov, Yuri V.
    Etingov, Pavel V.
    Ma, Jian
    Huang, Zhenyu
    Subbarao, Krishnappa
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2011, 2 (04) : 433 - 442