The risk assessment of construction project investment based on prospect theory with linguistic preference orderings

被引:40
|
作者
Gou, Xunjie [1 ]
Xu, Zeshui [1 ]
Zhou, Wei [2 ]
Herrera-Viedma, Enrique [3 ,4 ]
机构
[1] Sichuan Univ, Business Sch, Chengdu, Peoples R China
[2] Yunnan Univ Finance & Econ, Sch Finance, Kunming, Yunnan, Peoples R China
[3] Univ Granada, Dept Comp Sci & Artificial Intelligence, Granada, Spain
[4] Abdulaziz Univ, Dept Elect & Comp Engn, Fac Engn, Jeddah, Saudi Arabia
来源
ECONOMIC RESEARCH-EKONOMSKA ISTRAZIVANJA | 2021年 / 34卷 / 01期
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Risk assessment; construction project investment; prospect theory; linguistic preference orderings; consensus;
D O I
10.1080/1331677X.2020.1868324
中图分类号
F [经济];
学科分类号
02 ;
摘要
Multiple experts decision-making (MEDM) can be regarded as a situation where a group of experts are invited to provide their opinions by evaluating the given alternatives, and then select the optimal alternative(s). As a useful linguistic expression model, linguistic preference orderings (LPOs) were established in which the order of alternatives and the relationships between two adjacent alternatives are fused well. Considering that prospect theory has the superiority in depicting risk attitudes (risk seeking for losses and risk aversion for gains) during the uncertain decision-making process, this paper develops a consensus model based on prospect theory to deal with MEDM problems with LPOs. Firstly, each LPO provided by expert is transformed into the responding DHLPR with complete consistency. Then, the reference point of expert is determined and the prospect preference matrix is established. Moreover, we can obtain the overall prospect consensus degree for a MEDM problem by calculating the similarity degree between individual and collective prospect preference matrix. Furthermore, a consensus improvement method is developed to complete the consensus reaching process. Finally, we apply the proposed method to deal with a practical MEDM problem involving the construction project investment, and make some comparative analyses with existing methods.
引用
收藏
页码:709 / 731
页数:23
相关论文
共 50 条
  • [31] Risk Information and Retirement Investment Choice Mistakes Under Prospect Theory
    Bateman, Hazel
    Stevens, Ralph
    Lai, Andy
    JOURNAL OF BEHAVIORAL FINANCE, 2015, 16 (04) : 279 - 296
  • [32] Occupational Health and Safety Risk Assessment based on Combination Weighting and Uncertain Linguistic Information: Method Development and Application to a Construction Project
    Liu, Ran
    Mou, Xun
    Liu, Hu-Chen
    IISE TRANSACTIONS ON OCCUPATIONAL ERGONOMICS & HUMAN FACTORS, 2020, 8 (04): : 175 - 186
  • [33] Research on Risk Sharing Mode of the Construction Project Based on Systems Theory
    Hu, Yunpeng
    ARCHITECTURE AND BUILDING MATERIALS, PTS 1 AND 2, 2011, 99-100 : 233 - 237
  • [34] Research in the Risk Control Model of Construction Project Based on Uncertain Theory
    Lin, Feng
    Guan, Jianping
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, 2011, : 93 - 96
  • [35] The application of evaluation method based on prospect theory in stock investment
    Yuan, Chang
    Sui, Yujia
    Gao, Jinping
    Pan, Yu
    Gao, Li
    DATA SCIENCE AND KNOWLEDGE ENGINEERING FOR SENSING DECISION SUPPORT, 2018, 11 : 1159 - 1167
  • [36] Investment risk assessment of anaerobic fermentation based hydrogen production project based on regret linguistic Z-number averaging Choquet integral operator
    Du, Yan-dong
    Zhou, Jia-le
    Zhou, Xin-yue
    Wu, Yang-wen
    Lu, Qiang
    RENEWABLE ENERGY, 2024, 227
  • [37] Multi-attribute Investment Ranking Method for Power Grid Project Construction Based on Improved Prospect Theory of "Rewarding Good and Punishing Bad" Linear Transformation
    Wang Z.
    Pan X.
    Ma Q.
    Dianwang Jishu/Power System Technology, 2019, 43 (06): : 2154 - 2162
  • [38] Study on Risk Assessment of Investment Project Decision Based on Fuzzy Comprehensive Evaluation
    Wang Mengjun
    Liu Shaobing
    Yue Pengwei
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1001 - 1004
  • [39] Model design of project risk assessment based on cloud theory
    School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100191, China
    Beijing Hangkong Hangtian Daxue Xuebao, 2008, 12 (1445-1447):
  • [40] A Model of Risk Assessment of Software Project Based on Grey Theory
    Pang Qinghua
    ICCSSE 2009: PROCEEDINGS OF 2009 4TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, 2009, : 538 - 541