Total Site Integration for Coke Oven Plant

被引:8
|
作者
Ulyev, Leonid M. [1 ]
Kapustenko, Petro A. [1 ]
Vasilyev, Mikhail A. [2 ]
Boldyryev, Stanislav A. [2 ]
机构
[1] Natl Tech Univ Kharkiv Polytech Inst, 21 Frunze St, UA-61002 Kharkov, Ukraine
[2] AO SODRUGESTVO T Co, UA-61002 Kharkov, Ukraine
关键词
D O I
10.3303/CET1335039
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The process of benzene distillation and process of coal tar distillation being typical for East European countries is analyzed in this paper. The pinch analysis method was selected to perform a reconstruction project. According to principles of pinch analysis, new network diagrams are designed and capacity of heat-exchange equipment is calculated. The using of "Total Site Profiles" showed the feasibility of heat pump integration. Heat pump integration allowed to reduce the external hot utilities usage on 368 kW and cold utilities usage on 368 kW. This project let to decrease the external hot utilities usage on 23 % and cold utilities usage on 24,13 %, and also offered the way of step-by-step retrofit of the plant.
引用
收藏
页码:235 / 240
页数:6
相关论文
共 50 条
  • [31] COKE OVEN DAP
    不详
    [J]. JOURNAL OF AGRICULTURAL AND FOOD CHEMISTRY, 1956, 4 (12) : 988 - 988
  • [32] ANALYSIS OF COKE OVEN OPERATION (DEVELOPMENTS OF COMBUSTION CONTROL FOR COKE OVEN - II).
    Yamura, Yoichi
    Yamamura, Haruo
    Yamamoto, Toshiyuki
    Takayama, Akihiko
    Takase, Shoji
    [J]. Transactions of the Iron and Steel Institute of Japan, 1983, 24 (04)
  • [33] OPTIMUM PARAMETERS FOR PLANT FOR EXTRACTIVE RECTIFICATION OF COKE-OVEN BENZOLE
    MIROSHNICHENKO, AA
    DUBROVSKAYA, DP
    ZARETSKII, MI
    [J]. COKE & CHEMISTRY USSR, 1974, (11): : 39 - 43
  • [34] Heating control methodology in coke oven battery at Rourkela Steel Plant
    Bandyopadhyay, SS
    Parthasarathy, L
    Gupta, A
    Bose, PR
    Mishra, U
    [J]. 55TH IRONMAKING CONFERENCE PROCEEDINGS, 1996, 55 : 343 - 346
  • [35] Repair of coke-oven batteries: the experience of the Rurkela metallurgical plant
    Das, P.
    Bose, P.R.
    Singh, B.N.
    [J]. Koks i Khimiya, 1993, (08): : 16 - 19
  • [36] Reducing the organic deposits in coke oven gas pipelines of steel plant
    Lin, SL
    Shen, JF
    Chen, WC
    [J]. 58TH IRONMAKING CONFERENCE PROCEEDINGS, 1999, 58 : 295 - 301
  • [37] COMBUSTION CHARACTERISTICS OF COKE OVEN (DEVELOPMENTS OF COMBUSTION CONTROL FOR COKE OVEN - I).
    Tamura, Yoichi
    Yamamoto, Toshiyuki
    Takayama, Akihiko
    Okui, Nobuyuki
    Takase, Shoji
    [J]. Transactions of the Iron and Steel Institute of Japan, 1983, 24 (04)
  • [38] LUNG-FUNCTION IN RETIRED COKE-OVEN PLANT WORKERS
    CHAU, N
    BERTRAND, JP
    GUENZI, M
    MAYER, L
    TECULESCU, D
    MUR, JM
    PATRIS, A
    MOULIN, JJ
    PHAM, QT
    [J]. BRITISH JOURNAL OF INDUSTRIAL MEDICINE, 1992, 49 (05): : 316 - 325
  • [39] Treatment of waste water from coke oven plant - A case study
    Mukherjee, D. C.
    Chowdhury, S. B.
    Paul, A.
    Rakshit, B.
    Das, Paulomi
    [J]. JOURNAL OF THE INDIAN CHEMICAL SOCIETY, 2012, 89 (08) : 1061 - 1069
  • [40] ROLE OF THE SOIL IN AIR PURIFICATION IN THE VICINITY OF A COKE-OVEN PLANT
    DOLGOVA, LG
    [J]. SOVIET SOIL SCIENCE, 1982, 14 (03): : 44 - 48