共 50 条
- [33] OPTIMUM PARAMETERS FOR PLANT FOR EXTRACTIVE RECTIFICATION OF COKE-OVEN BENZOLE [J]. COKE & CHEMISTRY USSR, 1974, (11): : 39 - 43
- [34] Heating control methodology in coke oven battery at Rourkela Steel Plant [J]. 55TH IRONMAKING CONFERENCE PROCEEDINGS, 1996, 55 : 343 - 346
- [35] Repair of coke-oven batteries: the experience of the Rurkela metallurgical plant [J]. Koks i Khimiya, 1993, (08): : 16 - 19
- [36] Reducing the organic deposits in coke oven gas pipelines of steel plant [J]. 58TH IRONMAKING CONFERENCE PROCEEDINGS, 1999, 58 : 295 - 301
- [38] LUNG-FUNCTION IN RETIRED COKE-OVEN PLANT WORKERS [J]. BRITISH JOURNAL OF INDUSTRIAL MEDICINE, 1992, 49 (05): : 316 - 325
- [40] ROLE OF THE SOIL IN AIR PURIFICATION IN THE VICINITY OF A COKE-OVEN PLANT [J]. SOVIET SOIL SCIENCE, 1982, 14 (03): : 44 - 48