共 50 条
- [21] Tool path planning for five-axis machining using the principal axis method [J]. INTERNATIONAL JOURNAL OF MACHINE TOOLS & MANUFACTURE, 1997, 37 (07): : 1025 - 1040
- [22] Tool path planning for five-axis machining using the principal axis method [J]. International Journal of Machine Tools and Manufacture, 1997, 37 (07): : 1025 - 1040
- [24] A Master-axis-based Feedrate Scheduling with Jerk Constraints for Five-axis Tool Center Point Trajectory [J]. 2015 INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2015, : 111 - 116
- [26] Accurate Trajectory Control for Five-Axis Tool-Path Planning [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 932 - 937
- [27] Five-axis HSM Tool-Path Planning of Integral Impeller [J]. FUNCTIONAL MANUFACTURING TECHNOLOGIES AND CEEUSRO I, 2010, 426-427 : 572 - +
- [29] B-spline path velocity planning considering multi-constraints in axis space for five-axis machine tool [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2021, 27 (01): : 137 - 148
- [30] Kinematic Reliability Analysis of Five-axis machine tool [J]. ADVANCED DESIGN TECHNOLOGY, PTS 1-3, 2011, 308-310 : 1292 - +