Project scheduling with time windows and scarce resources - Temporal and resource-constrained project scheduling with regular and nonregular objective functions - Preface

被引:0
|
作者
Neumann, K [1 ]
Schwindt, C [1 ]
Zimmermann, J [1 ]
机构
[1] Univ Karlsruhe, Inst Econ Theory & Operat Res, D-76128 Karlsruhe, Germany
关键词
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:V / +
页数:17
相关论文
共 50 条
  • [31] Batch scheduling in process industries: an application of resource-constrained project scheduling
    Schwindt, C
    Trautmann, N
    [J]. OR SPEKTRUM, 2000, 22 (04) : 501 - 524
  • [32] Model Research of Multi-Objective and Resource-Constrained Project Scheduling Problem
    Zhou, Rong
    Ye, Chun-ming
    Ma, Hui-min
    [J]. 19TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: MANAGEMENT SYSTEM INNOVATION, 2013, : 991 - 1001
  • [33] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Wanlin Liu
    Li Ge
    Chunli Qu
    Shun Yang
    [J]. KSCE Journal of Civil Engineering, 2024, 28 : 15 - 28
  • [34] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Kucuksayacigil, Fikri
    Ulusoy, Gunduz
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (03) : 426 - 446
  • [35] Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
    Fikri Kucuksayacigil
    Gündüz Ulusoy
    [J]. Frontiers of Engineering Management, 2020, 7 : 426 - 446
  • [36] Bi-objective resource-constrained project scheduling with robustness and makespan criteria
    Abbasi, Babak
    Shadrokh, Shahram
    Arkat, Jamal
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) : 146 - 152
  • [37] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Liu, Wanlin
    Ge, Li
    Qu, Chunli
    Yang, Shun
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (01) : 15 - 28
  • [38] Resource-Constrained Project Scheduling Problem under Multiple Time Constraints
    Kong, Feng
    Dou, Dong
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (02)
  • [39] Approximability results for the resource-constrained project scheduling problem with a single type of resources
    Gafarov, Evgeny R.
    Lazarev, Alexander A.
    Werner, Frank
    [J]. ANNALS OF OPERATIONS RESEARCH, 2014, 213 (01) : 115 - 130
  • [40] Approximability results for the resource-constrained project scheduling problem with a single type of resources
    Evgeny R. Gafarov
    Alexander A. Lazarev
    Frank Werner
    [J]. Annals of Operations Research, 2014, 213 : 115 - 130