共 50 条
- [2] Resource-constrained project scheduling - Minimization of general objective functions [J]. PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 175 - 299
- [3] An approach with Decomposition on Time Windows for Resource-Constrained Project Scheduling [J]. 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 4897 - 4903
- [4] Resource-constrained project scheduling and timetabling [J]. PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
- [6] Resource-constrained project scheduling - Minimization of project duration [J]. PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174
- [8] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
- [9] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time [J]. Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44):