FUZZY ASSESSMENT ON RISK OF DEEP EXCAVATION ENGINEERING

被引:0
|
作者
Ren Feng [1 ]
Liu Jun-yan [1 ]
机构
[1] Univ Jinan, Sch Civil Engn & Architecture, Jinan, Shandong, Peoples R China
关键词
excavation engineering; risk analysis; fuzzy comprehensive assessment on risk;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper proposes the approach of analyzing risk of deep excavation engineering based on fuzzy theory. By using fuzzy mathematical method, the risk assessment model is established, and a practical method on fuzzy comprehensive assessment on risk of deep excavation engineering is proposed, and the practicability of this method is verified in a real engineering projects.
引用
收藏
页数:3
相关论文
共 50 条
  • [21] Design & practice on special deep & large excavation engineering in Shanghai
    Zhao, XH
    Gong, J
    Chen, ZM
    Bao, Y
    [J]. GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 239 - 244
  • [23] A case study of building damage risk assessment due to the multi-propped deep excavation in deep soft soil
    Lee, Sun-Jae
    Song, Tae-Won
    Lee, Yoon-Sang
    Song, Young-Han
    Kim, Jae-Kwon
    [J]. Soft Soil Engineering, 2007, : 281 - 290
  • [24] Effect of sandy soil deep excavation engineering on adjacent circumstance
    Yu, Jian-Lin
    Xia, Xiao
    Zhang, Wei
    Hu, Li-Ke
    [J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2014, 36 : 311 - 318
  • [25] Editorial: Deep rock mass engineering: Excavation, monitoring, and control
    Gui, Yilin
    Yin, Zhiqiang
    Du, Kun
    [J]. FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [26] Effect of deep excavation engineering on safety protective region of bridges
    Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China
    不详
    [J]. Yantu Gongcheng Xuebao, 2006, SUPPL. (1466-1469):
  • [27] Fuzzy Comprehensive Evaluation Method for Risk Assessment in EPC International Engineering Project
    Liu, Ruiyu
    Ye, Ziwan
    [J]. PROCEEDINGS OF CHINA-CANADA INDUSTRY WORKSHOP ON ENTERPRISE RISK MANAGEMENT 2008, 2008, : 293 - 299
  • [28] Fuzzy Probability Method-Based Risk Assessment of International Engineering Project
    Liu, Zhangjun
    Kong, Ya
    [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 3180 - 3183
  • [29] Research on the Risk Assessment of Engineering Project Based on Grey Theory and Fuzzy Mathematics
    Zhang Tiefu
    Yan Jun
    Zhang Xing
    Peng Dahai
    [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10724 - +
  • [30] Risk evaluation of environmental monitoring indexes for deep excavation
    Zhang, Jiao
    [J]. ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 1464 - 1468