Field and numerical investigation on the stability of coal pillars of gob-side entry driving with top coal

被引:17
|
作者
Ma, Zhenqian [1 ,2 ,3 ]
Chen, Chuan [3 ]
Liang, Xuchao [3 ]
Chen, Anmin [3 ]
Song, Wenxian [4 ]
机构
[1] China Univ Min & Technol, State Key Lab Geomech & Deep Underground Engn, Beijing 100083, Peoples R China
[2] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Xuzhou 221116, Jiangsu, Peoples R China
[3] Guizhou Univ, Sch Min, Guiyang 550025, Guizhou, Peoples R China
[4] Zhengzhou Coal & Elect Co Ltd, Lugou Coal Mine, Xinmi 454000, Henan, Peoples R China
基金
中国国家自然科学基金;
关键词
Coal pillars; Gob-side entry driving; Top coal; Stress distribution; Field monitoring; DESIGN; ROOM; MINE;
D O I
10.1007/s12517-020-06234-5
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Determining the reasonable width of coal pillars is the key to the successful application of gob-side entry driving technology in coal mining. A comprehensive research method including numerical simulation, field monitoring, and theoretical analysis was proposed to determine the reasonable width of the coal pillars of gob-side entry with top coal based on a case study conducted in the Lugou Coal Mine, Henan Province, China. According to a comprehensive analysis of the stress distribution characteristics of the narrow coal pillar and the influence of the coal pillar width on the roadway deformation, the reasonable width of the coal pillar was determined to be 6 m with consideration of the stability of the coal pillar, roadway deformation, and coal recovery rate. Two principles for maintaining the stability of the gob-side entry with top coal were proposed, that is, strengthening the roof support to ensure top coal stability, and strengthening the support structure of the coal ribs to achieve collaborative control. Field monitoring indicated that the bolting support could effectively control the severe deformation of the roadway along the gob-side entry driving in the soft coal seam.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] Study of control technology about gob-side entry driving with top-coal caving in inclined extra-thick coal seam
    Liu, Yaoxin
    Gao, Mingshi
    He, Yongliang
    Yu, Xin
    Xu, Dong
    [J]. Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2021, 50 (06): : 1051 - 1059
  • [22] Numerical Investigation of the Influence of Roof-Cutting Parameters on the Stability of Top Coal Gob-Side Entry Retaining by Roof Pre-Fracturing in Ultra-Thick Coal Seam
    Yang, Yongkang
    Gao, Peipeng
    Zhang, Chao
    Wang, Chenlong
    [J]. ENERGIES, 2023, 16 (12)
  • [23] Reasonable Width of Narrow Coal Pillar of Gob-side Entry Driving in Large Mining Height
    Ming, Zhao
    Shuai, Zhang
    Yong, Chen
    [J]. 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2017, 59
  • [24] Determination of coal pillar width and surrounding rock control technology for gob-side entry driving
    Wang, Zhiqiang
    Zhong, Qiyao
    Wang, Peng
    Shi, Lei
    Huang, Xuanhao
    [J]. Meitan Kexue Jishu/Coal Science and Technology (Peking), 2021, 49 (12): : 29 - 37
  • [25] Coal Pillar Size Determination and Surrounding Rock Control for Gob-Side Entry Driving in Deep Soft Coal Seams
    Jiang, Zaisheng
    Guo, Wenke
    Xie, Shengrong
    [J]. PROCESSES, 2023, 11 (08)
  • [26] Gob-side entry driving with small-coal-pillar for Carboniferous extra thick coal seam under Jurassic coal pillar
    Hongfei Duan
    Lijuan Zhao
    [J]. Arabian Journal of Geosciences, 2022, 15 (10)
  • [27] Stability Control of Overburden and Coal Pillar in the Gob-Side Entry Under Dynamic Pressure
    Wang, Meng
    Xu, Yalong
    Xu, Qingyun
    Shan, Chengfang
    Li, Zhenhua
    Nan, Hua
    Li, Yafeng
    Liu, Honglin
    Chu, Tingxiang
    [J]. SSRN, 2022,
  • [28] Surrounding rock control of gob-side entry driving with narrow coal pillar and roadway side sealing technology in Yangliu Coal Mine
    Zha Wenhua
    Shi Hao
    Liu San
    Kang Changhao
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2017, 27 (05) : 819 - 823
  • [29] Surrounding rock control of gob-side entry driving with narrow coal pillar and roadway side sealing technology in Yangliu Coal Mine
    Zha Wenhua
    Shi Hao
    Liu San
    Kang Changhao
    [J]. International Journal of Mining Science and Technology, 2017, 27 (05) : 819 - 823
  • [30] Feasibility Analysis of Gob-Side Entry Retaining in Steep Coal Seam
    Deng Yuehua
    Wang Shouquan
    Fan Yingchong
    Chen Xiankun
    [J]. 2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 608 - 611