Historic US launch takes crew to ISS

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
引用
收藏
页码:4 / 4
页数:1
相关论文
共 50 条
  • [41] ISS payload launch site capabilities and processing flow
    Archer, JL
    [J]. SPACE TECHNOLOGY AND APPLICATIONS INTERNATIONAL FORUM, PTS 1 AND 2, 2000, 504 : 117 - 123
  • [42] ISS crew changeout - New crew prepares for six-month stay on the International Space Station
    Covault, C
    [J]. AVIATION WEEK & SPACE TECHNOLOGY, 2003, 159 (16): : 30 - 31
  • [43] ISS mating adaptor to launch on STS-88
    不详
    [J]. AVIATION WEEK & SPACE TECHNOLOGY, 1997, 147 (01): : 30 - 30
  • [44] NASA crew launch vehicle flight test options
    Cockrell, Charles E.
    Davis, Stephan R.
    Robinson, Kimberly
    Tuma, Margaret L.
    Sullivan, Greg
    [J]. ACTA ASTRONAUTICA, 2007, 61 (1-6) : 438 - 449
  • [45] Launch and landing site science processing for ISS utilization
    Shao, MM
    van Twest, J
    van den Ende, O
    Gruendel, D
    Wells, D
    Moyer, J
    Heuser, J
    Etheridge, G
    [J]. SPACE TECHNOLOGY AND APPLICATIONS INTERNATIONAL FORUM, PTS 1 AND 2, 2000, 504 : 130 - 135
  • [46] Historic terminal takes a ride in Newark
    Fairweather, V
    [J]. CIVIL ENGINEERING, 2000, 70 (12): : 11 - 11
  • [47] Historic shark decision takes effect
    不详
    [J]. MARINE POLLUTION BULLETIN, 2014, 87 (1-2) : 6 - 6
  • [48] RVC rowing crew takes on 100 km test
    不详
    [J]. VETERINARY RECORD, 2019, 184 (22) : 666 - 666
  • [49] SIRTF takes big step toward launch
    Smith, BA
    [J]. AVIATION WEEK & SPACE TECHNOLOGY, 1996, 145 (02): : 61 - 62
  • [50] Investigation of the crew induced disturbance to the ISS GN&C system
    Merancy, Nujoud F.
    [J]. 2006 IEEE Aerospace Conference, Vols 1-9, 2006, : 4419 - 4425