Deformation Responses and Mechanical Mechanism of Existing Tunnel due to New Building Construction

被引:1
|
作者
Guo, Haifeng [1 ,2 ]
Ma, Dong [1 ]
Yao, Aijun [2 ]
机构
[1] China Railway 16th Bur Grp Co Ltd, Beijing 100018, Peoples R China
[2] Beijing Univ Technol, Key Lab Urban Secur & Disaster Engn, Minist Educ, Beijing 100124, Peoples R China
关键词
SHIELD TUNNEL; BASEMENT EXCAVATION; DEEP EXCAVATIONS; ADJACENT EXCAVATION; LAND SUBSIDENCE; DISPLACEMENT; FOUNDATION; PREDICTION; MODELS;
D O I
10.1155/2021/6623234
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study mainly investigated the variation law and mechanical mechanism of surrounding earth pressure and deformation of an existing tunnel, caused by dewatering, foundation excavation, building loading, and groundwater recovery. According to different dewatering schemes, two modes were established: nonisolated dewatering unloading-loading mode and isolated dewatering unloading-loading mode. Through large-scale similar materials model test, the variation law of deformation and surrounding earth pressure of adjacent tunnel under complex unloading-loading conditions was preliminarily revealed. Based on the size of the prototype project, the test results were further verified by the numerical simulation. The mechanical mechanism of tunnel deformation in different construction stages was analyzed after the comparative study. The results show that the tunnel structure deformation, vertical and horizontal displacement, and torsion occur in the process of building construction. In the nonisolated dewatering unloading-loading mode, the decrease or rise of the groundwater level significantly reduces (maximum 27.85%) or increases (maximum 35.19%) the surrounding earth pressure of the tunnel. The decrease or increase of the horizontal total stress was much greater than that of the vertical total stress, which leads to the deformation of tunnel structure. The vertical displacement of the tunnel is generally settlement, which mainly occurs in the stage of dewatering and building loading, accounting for 83.21%100.00% and 25.11%-40.34% of the total settlement, respectively. In the stage of foundation pit excavation and groundwater recovery, the tunnel rises. In the horizontal direction, the tunnel moves towards the foundation pit, mainly in the excavation stage, accounting for 82.77%-86.30% of the maximum value. Due to the uneven change of displacement field and stress field of soil outside the foundation pit, the tunnel torsion occurs. In the isolated dewatering unloading-Loading mode, the change of groundwater has little effect on the tunnel. In the stage of excavation and construction load, the variation law of tunnel surrounding earth pressure and deformation is similar in the two modes.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Coupling analysis method of grouting construction with deformation response of adjacent existing tunnel
    Jiang, Ping-wei
    Zhang, Zhi-hong
    Zheng, Hong
    Huang, Jin-kun
    UNDERGROUND SPACE, 2024, 15 : 312 - 330
  • [32] Influence of bored subway tunnel construction on the deformation of existing pipelines and control techniques
    Gao, Bingli
    Modern Tunnelling Technology, 2014, 51 (04) : 96 - 101
  • [33] Deformation and mechanical characteristics of tunnel lining in tunnel intersection between subway station tunnel and construction tunnel
    Li, Yayong
    Jin, Xiaoguang
    Lv, Zhitao
    Dong, Jianghui
    Guo, Jincheng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 56 : 22 - 33
  • [34] Spatiotemporal Deformation of Existing Pipeline Due to New Shield Tunnelling Parallel Beneath Considering Construction Process
    Liu, Xiang
    Jiang, Annan
    Fang, Qian
    Wan, Yousheng
    Li, Jianye
    Guo, Xinping
    APPLIED SCIENCES-BASEL, 2022, 12 (01):
  • [35] Mechanical characteristics of twin tunnel underneath construction on existing high-speed railway tunnel
    Fei, Ruizhen
    Peng, Limin
    Zhang, Chunlei
    Zhang, Jiqing
    Zhang, Peng
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (01) : 403 - 420
  • [36] The effect of new tunnel construction under existing metro tunnels
    Moss, N. A.
    Bowers, K. H.
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2006, : 151 - +
  • [37] Numerical Analysis of New Shield Tunnel on Mechanical Behavior of Existing Parallel Tunnel
    Li, Xuefeng
    Du, Shouji
    Zhang, Dingfeng
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1429 - 1434
  • [38] Analysis of longitudinal displacement of existing shield tunnel due to construction of above-crossing new tunnel considering the weakening of circumferential joint
    Zhang Z.
    Liang R.
    Gao K.
    Li Z.
    Xiao M.
    Guo Y.
    Yue T.
    Wu W.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2022, 41 : 2955 - 2970
  • [39] Mechanical responses of underground carriageway structures due to construction of metro tunnels beneath the existing structure: A case study
    Xin Han
    Fei Ye
    Xingbo Han
    Chao Ren
    Jing Song
    Ruliang Zhao
    DeepUndergroundScienceandEngineering, 2024, 3 (02) : 231 - 246
  • [40] Mechanical responses of underground carriageway structures due to construction of metro tunnels beneath the existing structure: A case study
    Han, Xin
    Ye, Fei
    Han, Xingbo
    Ren, Chao
    Song, Jing
    Zhao, Ruliang
    DEEP UNDERGROUND SCIENCE AND ENGINEERING, 2024, 3 (02) : 231 - 246