Adaptation and approximate strategies for solving the lot-sizing and scheduling problem under multistage demand uncertainty

被引:29
|
作者
Curcio, Eduardo [1 ]
Amorim, Pedro [2 ]
Zhang, Qi [3 ]
Almada-Lobo, Bernardo [2 ]
机构
[1] INESC TEC, Porto, Portugal
[2] Univ Porto, Fac Engn, INESC TEC, Porto, Portugal
[3] Univ Minnesota, Dept Chem Engn & Mat Sci, 421 Washington Ave SE, Minneapolis, MN 55455 USA
关键词
Lot-sizing and scheduling problem; GLSP; Adjustable robust optimization; Multistage stochastic programming; Rolling-horizon; ADJUSTABLE ROBUST OPTIMIZATION; SEQUENCE-DEPENDENT SETUPS; ROLLING-HORIZON; HEURISTICS; MANAGEMENT; COSTS; MODEL; TIMES;
D O I
10.1016/j.ijpe.2018.04.012
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work addresses the lot-sizing and scheduling problem under multistage demand uncertainty. A flexible production system is considered, with the possibility to adjust the size and the schedule of lots in every time period based on a rolling-horizon planning scheme. Computationally intractable multistage stochastic programming models are often employed on this problem. An adaptation strategy to the multistage setting for two-stage programming and robust optimization models is proposed. We also present an approximate heuristic strategy to address the problem more efficiently, relying on multistage stochastic programming and adjustable robust optimization. In order to evaluate each strategy and model proposed, a Monte Carlo simulation experiment under a rolling-horizon scheme is performed. Results show that the strategies are promising in solving large-scale problems: the approximate strategy based on adjustable robust optimization has, on average, 6.72% better performance and is 7.9 times faster than the deterministic model.
引用
收藏
页码:81 / 96
页数:16
相关论文
共 50 条
  • [41] A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem
    Wolosewicz, Cathy
    Dauzere-Peres, Stephane
    Aggoune, Riad
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (01) : 3 - 12
  • [42] A COST-SAVING TECHNIQUE FOR SOLVING CAPACITATED MULTISTAGE LOT-SIZING PROBLEMS
    CHIU, HN
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 24 (03) : 367 - 377
  • [43] Integrated lot-sizing and pricing problem under cross-price demand model
    Terzi, Mourad
    Yalaoui, Alice
    Ouazene, Yassine
    Yalaoui, Farouk
    [J]. IFAC PAPERSONLINE, 2022, 55 (10): : 2372 - 2377
  • [44] Chance-constrained programming with robustness for lot-sizing and scheduling problems under complex uncertainty
    Hui, Jizhuang
    Wang, Shuai
    Bin, Zhu
    Xiong, Guangwei
    Lv, Jingxiang
    [J]. ASSEMBLY AUTOMATION, 2022, 42 (04) : 490 - 505
  • [45] Robust optimization for lot-sizing problems under yield uncertainty
    Metzker, Paula
    Thevenin, Simon
    Adulyasak, Yossiri
    Dolgui, Alexandre
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2023, 149
  • [46] Adaptive robust optimization for lot-sizing under yield uncertainty
    Soares, Paula Metzker
    Thevenin, Simon
    Adulyasak, Yossiri
    Dolgui, Alexandre
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 313 (02) : 513 - 526
  • [47] Production strategies for a stochastic lot-sizing problem with constant capacity
    Dellaert, NP
    Melo, MT
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 92 (02) : 281 - 301
  • [48] A soft optimization approach for solving a complicated mutilevel lot-sizing problem
    Kaku, Ikou
    Xu, Chunhui
    [J]. ICIM 2006: Proceedings of the Eighth International Conference on Industrial Management, 2006, : 3 - 8
  • [49] An approach for solving the lot-sizing problem of a market-driven foundry
    Tonaki, V. S.
    Toledo, F. M. B.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (01) : 108 - 114
  • [50] A HEURISTIC FOR A RESOURCE-CAPACITATED MULTISTAGE LOT-SIZING PROBLEM WITH LEAD TIMES
    CLARK, AR
    ARMENTANO, VA
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (10) : 1208 - 1222