Numerical analysis and monitoring of an embankment dam during construction and first impounding Case study: Siah Sang Dam

被引:8
|
作者
Rashidi, M. [1 ]
Heidari, M. [2 ]
Azizyan, Gh. [2 ]
机构
[1] Sharif Univ Technol, Dept Civil Engn, Tehran, Iran
[2] Univ Sistan & Baluchestan, Dept Civil Engn, Zahedan, Iran
关键词
Earth dams; Initial impounding; Numerical modeling; Instrumentation; Vertical displacement; Stress; CONSOLIDATION;
D O I
10.24200/sci.2017.4181
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Monitoring embankment dams is of crucial importance. In earth dams, the pore pressures, earth pressures, and displacements occurring during construction and function are measured at the time of the first impounding and exploitation by installing essential instruments, and so the dam's performance is evaluated and analyzed. Scope of the present research is the evaluation of Siah-Sang Dam performance through the results of instruments and back analysis, conducted by FLAC software. The Mohr-Coulomb elastic-plastic model has been considered as the behavioral model of the dam, and the effect of the upstream shell's materials deformation has been modeled at the time of the initial impounding. Following that, comparing the results of the numerical analysis with the measured values indicates that there is a proper consistency between these two values. Moreover, it was observed that the dam's performance was suitable regarding the created pore water pressure, displacements, and stresses in the construction period as well as during the first impounding. hi addition, susceptibility of the hydraulic fracturing was assessed by calculating the arching ratio. It was concluded that this dam is secure in comparison with the behavior of other similar clams in Iran and the world. (C) 2018 Sharif University of Technology. All rights reserved.
引用
收藏
页码:505 / 516
页数:12
相关论文
共 50 条
  • [31] Analysis and monitoring of the behavior of a rock fill dam ten years after construction: a case study of the Iran-Madani Dam
    Farajniya, Rasoul
    Poursorkhabi, Ramin Vafaei
    Zarean, Ahmad
    Dabiri, Rouzbeh
    GEOENVIRONMENTAL DISASTERS, 2024, 11 (01)
  • [32] Morris Sensitivity Analysis for Hydrothermal Coupling Parameters of Embankment Dam: A Case Study
    Ren, Jie
    Zhang, Wenbing
    Yang, Jie
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [33] Dam construction in northern environment: A numerical study
    Shen, M
    Konrad, JM
    COLD REGIONS ENGINEERING: THE COLD REGIONS INFRASTRUCTURE: AN INTERNATIONAL IMPERATIVE FOR THE 21ST CENTURY, 1996, : 736 - 744
  • [34] DYNAMIC ANALYSIS OF EARTH DAM USING NUMERICAL METHOD - A CASE STUDY: DOYRAJ EARTH DAM
    Mazaheri, Ahmad R.
    Komasi, Mehdi
    Veisi, Majid
    Nasiri, Masoud
    ACTA GEOTECHNICA SLOVENICA, 2021, 18 (01): : 65 - 78
  • [35] A Numerical Analysis of the Leakage Characteristics of an Embankment Dam Slope With Internal Erosion
    Jia, Yu
    Ding, Yu
    Wang, Xuan
    Zhang, Jiasheng
    Chen, Xiaobin
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [36] Investigation of groundwater chemistry at a dam site during its construction: a case study of Xiangjiaba Dam, China
    Ji-Xiang Huo
    Han-Zhou Song
    Li Luo
    Environmental Earth Sciences, 2015, 74 : 2451 - 2461
  • [37] Investigation of groundwater chemistry at a dam site during its construction: a case study of Xiangjiaba Dam, China
    Huo, Ji-Xiang
    Song, Han-Zhou
    Luo, Li
    ENVIRONMENTAL EARTH SCIENCES, 2015, 74 (03) : 2451 - 2461
  • [38] Safety assessment and treatment techniques of an operated dam with a leakage problem: case study of Hisarardi embankment dam
    Cavus, Ugur Safak
    Kilit, Murat
    ENVIRONMENTAL EARTH SCIENCES, 2022, 81 (24)
  • [39] Safety assessment and treatment techniques of an operated dam with a leakage problem: case study of Hisarardi embankment dam
    Ugur Safak Cavus
    Murat Kilit
    Environmental Earth Sciences, 2022, 81
  • [40] Prediction of and Early Warning for Deformation and Stress in the Xiaowan Arch Dam during the First Impounding Stage
    Zhou Qiujing
    Zhang Guoxin
    Liu Yi
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 2463 - 2472