A hybrid conceptual cost estimating model using ANN and GA for power plant projects

被引:24
|
作者
Hashemi, Sanaz Tayefeh [1 ,2 ]
Ebadati, Omid Mandi E. [3 ]
Kaur, Harleen [4 ]
机构
[1] MAPNA Grp Co, Planning & Coordinat Deputy Power Div, 231 Mirdamad Blvd, Tehran 1918953651, Iran
[2] Kharazmi Univ, Dept Informat Technol Management, 242 Somayeh St, Tehran 1593656311, Iran
[3] Kharazmi Univ, Dept Math & Comp Sci, 242 Somayeh St, Tehran 1593656311, Iran
[4] Hamdard Univ, Sch Engn Sci & Technol, Dept Comp Sci & Engn, New Delhi 110062, India
来源
NEURAL COMPUTING & APPLICATIONS | 2019年 / 31卷 / 07期
关键词
MAPNA Group Co; Artificial neural network (ANN); Genetic algorithm (GA); Construction cost; Early-stage cost estimation; NEURAL-NETWORK MODEL;
D O I
10.1007/s00521-017-3175-5
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Providing an accurate completion cost estimate helps managers in deciding whether to undertake the project due to cash in hand. Hence, MAPNA Group Co. as an Iranian leading general contractor of power plant projects is not an exception too. Cost prediction in these projects is of great importance, whereas it can assist managers to keep their overall budget under control. Literature has been reviewed and influencing variables are explored. Thereafter, an artificial neural network model is developed and combined with genetic algorithm to select the best network architecture. According to the literature reviewed, almost all of the performed studies have selected the optimum network architecture through a process of trial and error, which makes the present method worthy of implementation. The best network architecture is capable of predicting projects' cost of accuracy equal to 94.71%. A sensitivity analysis is then performed to test the significance degree of model input variables.
引用
收藏
页码:2143 / 2154
页数:12
相关论文
共 50 条
  • [31] Conceptual Cost Estimation Model for Engineering Services in Public Construction Projects
    Hyari, Khaled Hesham
    Al-Daraiseh, Ahmad
    El-Mashaleh, Mohammad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
  • [32] Hybrid ANN-CBR model for disputed change orders in construction projects
    Chen, Jieh-Haur
    Hsu, S. C.
    [J]. AUTOMATION IN CONSTRUCTION, 2007, 17 (01) : 56 - 64
  • [33] ANN Based Reactive Power Control of an Autonomous Wind-Diesel Hybrid Power Plant using PMIG and SG
    Sharma, Pawan
    Hoff, Bjarte
    Meena, Ramkesh
    [J]. 2014 POWER AND ENERGY SYSTEMS CONFERENCE: TOWARDS SUSTAINABLE ENERGY, 2014,
  • [34] Using ANN to Predict the Impact of Communication Factors on the Rework Cost in Construction Projects
    Trach, Roman
    Trach, Yuliia
    Lendo-Siwicka, Marzena
    [J]. ENERGIES, 2021, 14 (14)
  • [35] ANN-based real-time parameter optimization via GA for superheater model in power plant simulator
    Ma, Jin
    Wang, Bing-Shu
    Ma, Yong-Guang
    [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2008, : 2269 - 2273
  • [36] CONCEPTUAL COST ESTIMATION FRAMEWORK FOR MODULAR PROJECTS: A CASE STUDY ON PETROCHEMICAL PLANT CONSTRUCTION
    Choi, Younguk
    Park, Chan Young
    Lee, Changjun
    Yun, Sungmin
    Han, Seung Heon
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (02) : 150 - 165
  • [37] Cost-Estimating Model for Rubberized Asphalt Pavement Rehabilitation Projects
    Shehab, Tariq
    Meisami-Fard, Ida
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2013, 19 (04) : 496 - 502
  • [38] Hybrid ANN-GA model for predicting turbidity and chlorophyll-a concentrations
    Mulia, Iyan E.
    Tay, Harold
    Roopsekhar, K.
    Tkalich, Pavel
    [J]. JOURNAL OF HYDRO-ENVIRONMENT RESEARCH, 2013, 7 (04) : 279 - 299
  • [39] Estimating arsenic concentration in compost production using ANN model
    Department of Agricultural Management and Property Studies, Lincoln University, New Zealand
    不详
    [J]. Test Eng Manage, 2019, 11-12 (5841-5846): : 5841 - 5846
  • [40] A cost-estimating method of civil engineering by using fuzzy mathematics and ANN
    Wang, JP
    Li, QF
    Wang, XJ
    [J]. ICIM' 2004: PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2004, : 599 - 604