共 50 条
- [22] Prediction Model for Disc Cutter Wear of Tunnel Boring Machines in Sandy Cobble Strata [J]. KSCE Journal of Civil Engineering, 2020, 24 : 1010 - 1019
- [24] Analysis of Shield Excavation Face Failure and Tunneling Control with Two Parameters in Sandy Cobble Strata [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2023, 51 (09): : 1407 - 1415
- [26] Three-Dimensional Limit Equilibrium Solution of Minimum Support Pressure of Shield Tunnel Face in Sandy Cobble Stratum [J]. Arabian Journal for Science and Engineering, 2021, 46 : 5061 - 5069