共 50 条
- [2] Reforming natural gas for CO2 pre-combustion capture in combined cycle power plant [J]. Clean Technologies and Environmental Policy, 2009, 11 : 67 - 76
- [4] Operability of Integrated Gasification Combined Cycle power plant with SEWGS technology for pre-combustion CO2 capture [J]. 12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 : 1986 - 1995
- [5] Plant flexibility of a pre-combustion CO2 capture cycle [J]. 10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 2556 - 2563
- [6] Developments in the pre-combustion CO2 capture pilot plant at the Buggenum IGCC [J]. 10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 1214 - 1221
- [8] Pre-combustion CO2 capture for IGCC plants by an adsorption process [J]. GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01): : 655 - 660
- [10] Performance and modelling of the pre-combustion capture pilot plant at the Buggenum IGCC [J]. 12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 : 6207 - 6214