共 50 条
- [2] Reforming natural gas for CO2 pre-combustion capture in combined cycle power plant [J]. Clean Technologies and Environmental Policy, 2009, 11 : 67 - 76
- [3] Plant flexibility of a pre-combustion CO2 capture cycle [J]. 10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 2556 - 2563
- [7] Pre-Combustion Carbondioxide Capture in Integrated Gasification Combined Cycles [J]. PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2010, 16 (02): : 173 - 179
- [9] Pre-combustion CO2 capture [J]. INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2015, 40 : 167 - 187
- [10] INTEGRATION AND PERFORMANCE ASSESSMENT OF HYDROGEN FIRED COMBINED CYCLE POWER PLANT WITH PSA PROCESS FOR CO2 CAPTURE IN A PRE-COMBUSTION IGCC POWER PLANT [J]. PROCEEDINGS OF THE ASME GAS TURBINE INDIA CONFERENCE 2012, 2012, : 773 - 786