Application of an immune algorithm to the short-term unit commitment problem in power system operation

被引:18
|
作者
Liao, G. -C. [1 ]
机构
[1] Fortune Inst Technol, Dept Elect Engn, Chyi Shan 842, Kaohsiung Cty, Taiwan
关键词
D O I
10.1049/ip-gtd:20045228
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
An immune algorithm, which includes a fuzzy system and an annealing immune operator is presented. The proposed immune algorithm (PIA) is applied to the short-term unit commitment (UC) problem in power system operation. The PIA differs from its counterparts in three main aspects: (i) the crossover and mutation ratios are changed from having fixed values and become a variable that is determined by the fuzzy system; (ii) it uses a memory cell; and (iii) it uses an annealing immune operator. These modifications result in three major advantages for the PIA: (i) it does not fall into locally optimum solutions; (ii) it can quickly and correctly find the full set of globally optimum solutions; and (iii) it can easily obtain the most economic solution to the UC problem. In particular it can deter-mine the start-up and shutdown schedules for the generation units so that they are able to meet forecasted demands at the minimum cost while satisfying adverse range of constraints. The PIA is used to generate schedules for cases containing 10, 20, 50, 70 and 90 generators. The schedules generated by the PIA are compared to those generated using the dynamic programming, Lagrangian relaxation, genetic algorithm, simulated annealing and tabu search methods. It is shown that the proposed method is valid and that it is able to produce excellent solutions.
引用
收藏
页码:309 / 320
页数:12
相关论文
共 50 条
  • [31] Power System Short-term Load Forecasting Based on Neural Network with Artificial Immune Algorithm
    Huang Yue
    Li Dan
    Gao Liqun
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 844 - 848
  • [32] CO2 Emission-Constrained Short-Term Unit Commitment Problem Using Shuffled Frog Leaping Algorithm
    Selvakumar, K.
    Selvabharathi, D.
    Palanisamy, R.
    Thamizh Thentral, T. M.
    JOURNAL OF ELECTRICAL AND COMPUTER ENGINEERING, 2023, 2023
  • [33] Immune algorithm and its application in short-term scheduling of hydro plant
    Center of Energy Development Research, Sichuan University, Chengdu 610065, China
    Shuili Fadian Xuebao, 2006, 6 (21-25):
  • [34] A priority list-based fuzzy logic controller for short-term unit commitment problem
    Kumar J.
    Verma A.
    Bhatti T.S.
    International Journal of Power and Energy Conversion, 2019, 10 (04): : 497 - 511
  • [35] Hybrid genetic algorithm/fuzzy system, simulated annealing and tabu search for short-term thermal generating unit commitment
    Liao, GC
    ENGINEERING INTELLIGENT SYSTEMS FOR ELECTRICAL ENGINEERING AND COMMUNICATIONS, 2004, 12 (02): : 99 - 106
  • [36] Fusion Forecasting Algorithm for Short-Term Load in Power System
    Yu, Tao
    Wang, Ye
    Zhao, Yuchong
    Luo, Gang
    Yue, Shihong
    ENERGIES, 2024, 17 (20)
  • [37] Multi-objectivization of Short-Term Unit Commitment under Uncertainty using Evolutionary Algorithm
    Trivedi, Anupam
    Sharma, Deepak
    Srinivasan, Dipti
    2012 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2012,
  • [38] A hybrid fuzzy neural network expert system for a short term unit commitment problem
    Padhy, NP
    Paranjothi, SR
    Ramachandran, V
    MICROELECTRONICS AND RELIABILITY, 1997, 37 (05): : 733 - 737
  • [39] An MILP Model for Short-term Peak Shaving Operation of Cascaded Hydropower Plants Considering Unit Commitment
    Su, Chengguo
    Cheng, Chuntian
    Wang, Peilin
    2018 IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2018 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2018,
  • [40] Unit Commitment using Nearest Neighbor as a Short-Term Proxy
    Dalal, Gal
    Gilboa, Elad
    Mannor, Shie
    Wehenkel, Louis
    2018 POWER SYSTEMS COMPUTATION CONFERENCE (PSCC), 2018,