Automatic train operation system for the high speed Shinkansen train

被引:0
|
作者
Yasui, Y.
机构
关键词
automatic train operation; automatic train control;
D O I
10.2495/CR060441
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In train operation over 300 km/h, drivers are supposed to operate the handle for acceleration or deceleration quite often due to speed restriction at the curve. To ensure on-schedule operation and lighten the burden imposed on drivers under high speed operation, we developed the automatic train operation system for the Shinkansen train. This system automatically controls the speed to follow the target speed of operation as well as obey Automatic Train Control (ATC). The target speed is set by taking account of the ATC restriction, on-schedule running, and energy-efficient operation. The system was applied to running tests using a series E2 Shinkansen train from Morioka to Hachinohe, about 100 km, on Tohoku Shinkansen line. The test results tell that the accuracy of on-schedule operation is 4 s longer than the simulated running time, and the accuracy of following the target speed is within 2 km/h at the maximum speed of 320 km/h. We conclude that the system performance is satisfactory for the secure speed control and on-schedule operation.
引用
收藏
页码:441 / 446
页数:6
相关论文
共 50 条
  • [31] Reliability Study of Maglev Automatic Train Operation System
    Yu Jianzhi
    Chen Yongsheng
    [J]. 2ND INTERNATIONAL SYMPOSIUM ON COMPUTER NETWORK AND MULTIMEDIA TECHNOLOGY (CNMT 2010), VOLS 1 AND 2, 2010, : 686 - 690
  • [32] Notch-based speed trajectory optimisation for high-speed railway automatic train operation
    Feng, Minling
    Wu, Chaoxian
    Lu, Shaofeng
    Wang, Yihui
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2022, 236 (02) : 159 - 171
  • [33] System analysis and design of automatic train operation on metro
    Huang, Liang-Ji
    Tang, Tao
    [J]. Beifang Jiaotong Daxue Xuebao/Journal of Northern Jiaotong University, 2002, 26 (03):
  • [34] Application of a reference train model in an automatic control system of freight-train speed
    Pudovikov O.E.
    Bespal’ko S.V.
    Kiselev M.D.
    Serdobintsev E.V.
    [J]. Russian Electrical Engineering, 2017, 88 (9) : 563 - 567
  • [35] Maintenance of the high-speed train fleet in operation
    Andrieu, Claude
    [J]. Revue Generale des Chemins de Fer, 2002, (MAR.): : 135 - 139
  • [36] NMPC Applied to Operation of High-speed Train
    Gang, Yang
    Liu Mingguang
    [J]. PROCEEDINGS OF 2012 2ND INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT 2012), 2012, : 1005 - 1008
  • [37] Trajectory Optimization for High-Speed Train Operation
    He Zhi-yu
    Yang Zhi-jie
    Lv Jing-yang
    [J]. 2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2065 - 2070
  • [38] Automatic Train Operation Using Autonomic Prediction of Train Runs
    Asuka, Masashi
    Kataoka, Kenji
    Komaya, Kiyotoshi
    Nishida, Syogo
    [J]. ELECTRICAL ENGINEERING IN JAPAN, 2011, 175 (03) : 65 - 73
  • [39] Digital automatic train control system for the shinkansen lines of East Japan Railway Company
    Igarashi, T
    Sato, T
    Harima, Y
    Uchimura, T
    [J]. COMPUTERS IN RAILWAYS VIII, 2002, 13 : 83 - 92
  • [40] Catenary-pantograph system for speedup of Shinkansen train
    Manabe, Katsushi
    [J]. Japanese Railway Engineering, 1992, (117): : 10 - 13