Balancing mixed-model assembly systems in the footwear industry with a variable neighbourhood descent method

被引:16
|
作者
Sadeghi, Parisa [1 ]
Rebelo, Rui Diogo [1 ]
Ferreira, Jose Soeiro [1 ,2 ]
机构
[1] INESC TEC Technol & Sci, Campus FEUP,Rua Dr Roberto Frias, P-4200465 Porto, Portugal
[2] Univ Porto FEUP, Fac Engn, Campus FEUP,Rua Dr Roberto Frias, P-4200465 Porto, Portugal
关键词
Mixed-model assembly line balancing; Footwear industry; Variable neighbourhood descent; Ranked positional weighted method; Simulation; ANT COLONY OPTIMIZATION; HYBRID GENETIC ALGORITHM; SHELTERED WORK CENTERS; SEARCH ALGORITHM; LINE; ASSIGNMENT; DESIGN; BRANCH;
D O I
10.1016/j.cie.2018.05.020
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses new Mixed-model Assembly Line Balancing Problems (MALBP) in a real industrial context, the stitching systems of a footwear company. The work is part of large ongoing projects with this industry, and the main purposes are minimising the number of required workstations and smoothing the operators' workload. The company has invested in new flexible automated assembly systems, which accommodate dozens of workstations and many moving boxes. Footwear components are inside boxes (with various quantities) which can move from the warehouses to a convenient workstation or between any workstations (in any order). This is a significant and distinct feature of the MALBP, together with the fact that the assignment of different skilled operators and machines is achieved simultaneously. An optimisation model is developed, in part to facilitate the understanding of the situation and to solve small-size instances. Due to the complexity of the problems, we had to devise an approximate method, based on the Variable Neighbourhood Descent (VND) metaheuristic and integrating an adaptation of the Ranked Positional Weighted (RPW) method. The adapted RPW method is used to create initial feasible solutions, while preassigning special operators and machines. After choosing good initial solutions, VND is applied to improve their quality. The new contributed method, named as RPW-VNDbal, is tested with medium and large instances, in two distinct stitching systems. A Lower Bound of the objective function and Simulation contribute to evaluate the solutions and their practicability. The results implemented by the project team, show that the RPW-VNDbal method is fast enough and offers better solutions than those implemented by the experienced operation managers of the company.
引用
收藏
页码:161 / 176
页数:16
相关论文
共 50 条
  • [31] Including Ergonomics Aspects into Mixed-Model Assembly Line Balancing Problem
    Sgarbossa, Fabio
    Battini, Daria
    Persona, Alessandro
    Visentin, Valentina
    [J]. ADVANCES IN PHYSICAL ERGONOMICS AND HUMAN FACTORS, 2016, 489 : 991 - 1001
  • [32] Integrated Mixed-Model Assembly Line Balancing with Unskilled Temporary Workers
    Kim, Dongwook
    Park, Jinwoo
    Moon, Ilkyeong
    [J]. ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II, 2015, 460 : 324 - 331
  • [33] Workload balancing and manufacturing complexity levelling in mixed-model assembly lines
    Zeltzer, Luiza
    Aghezzaf, El-Houssaine
    Limere, Veronique
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (10) : 2829 - 2844
  • [34] A goal programming approach to mixed-model assembly line balancing problem
    Gokcen, H
    Erel, E
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (02) : 177 - 185
  • [35] Optimization of mixed-model assembly line balancing problem with resource constraints
    Razali, M. M.
    Ab Rashid, M. F. F.
    Make, M. R. A.
    [J]. PROCEEDINGS OF MECHANICAL ENGINEERING RESEARCH DAY 2017 (MERD), 2017, : 115 - 117
  • [36] A hybrid genetic algorithm approach to mixed-model assembly line balancing
    A. Noorul Haq
    K. Rengarajan
    J. Jayaprakash
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 28 : 337 - 341
  • [37] An investigation of mixed-model assembly line balancing problem with uncertain assembly time in remanufacturing
    Liu, Qingtao
    Wei, Xinji
    Wang, Qi
    Song, Jiayao
    Lv, Jingxiang
    Liu, Ying
    Tang, Ou
    [J]. Computers and Industrial Engineering, 2024, 198
  • [38] Workforce minimization for a mixed-model assembly line in the automotive industry
    Battaia, Olga
    Delorme, Xavier
    Dolgui, Alexandre
    Hagemann, Johannes
    Horlemann, Anika
    Kovalev, Sergey
    Malyutin, Sergey
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 170 : 489 - 500
  • [39] A STUDY ON DESIGN METHOD FOR MIXED-MODEL ASSEMBLY LINES
    Xu, Zhuqi
    Hiraki, Shusaku
    Ishihara, Yoshiaki
    Su, Yuanming
    [J]. ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 77 - +
  • [40] A method to balancing robotic mixed-model assembly lines: Practical constraints, computational challenges, and performance estimation
    Schibelbain, Daniel
    Lopes, Thiago Cantos
    Magatão, Leandro
    [J]. Computers and Industrial Engineering, 2024, 197