共 50 条
- [41] Risk allocation of bot project based on the optimal risk responding strategies PROCEEDINGS OF CRIOCM 2006 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2006, : 401 - 407
- [42] A Study on the Risk Hierarchical Model and Risk Conduction Based on the Enterprise Complex Information System 2009 INTERNATIONAL FORUM ON INFORMATION TECHNOLOGY AND APPLICATIONS, VOL 3, PROCEEDINGS, 2009, : 595 - 599
- [43] Panoramic information model extension for transmission equipment based on common information model Gaodianya Jishu/High Voltage Engineering, 2015, 41 (12): : 3929 - 3936
- [44] RESEARCH ON INFORMATION HIDING BASED ON GRAY PREDICTION MODEL 2017 14TH INTERNATIONAL COMPUTER CONFERENCE ON WAVELET ACTIVE MEDIA TECHNOLOGY AND INFORMATION PROCESSING (ICCWAMTIP), 2017, : 193 - 196
- [46] Gray-Markov GM (1,1) Prediction Model Optimal Allocation of Equipment Maintenance Personnel based on Difference Method GREEN POWER, MATERIALS AND MANUFACTURING TECHNOLOGY AND APPLICATIONS III, PTS 1 AND 2, 2014, 484-485 : 847 - +
- [47] GERT Network Model for Multidimensional Risk Transfer of Equipment Development Project CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 585 - 593
- [48] Combined Optimization Method Based on Project Risk and Resource Allocation PROCEEDINGS OF THE 27TH CHINESE CONTROL CONFERENCE, VOL 7, 2008, : 138 - 141
- [50] Fault Diagnosis Method of Complex Equipment Based on Gray Relational Analysis with Entropy Weight PROCEEDINGS OF THE FIRST SYMPOSIUM ON AVIATION MAINTENANCE AND MANAGEMENT, VOL I, 2014, 296 : 599 - 607