The Application of the Creep Model in the High-Speed Railway Subgrade Settlement Prediction Techniques

被引:1
|
作者
Li, Jian [1 ]
Chen, Shan-Xiong [1 ]
Yu, Fei [1 ]
机构
[1] Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan, Peoples R China
关键词
creep model; post-construction settlement; settlement prediction; numerical simulation;
D O I
10.4028/www.scientific.net/AMM.423-426.1253
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Settlement prediction is an important method to judge whether the post-construction settlement of the high-speed railway foundation satisfies the requirement of the standard. The paper uses the numerical calculating method based on creep model to predict the subgrade post-construction settlement of the surcharge preloading processing segment of the high-speed railway through inversing the creep parameters, and does comparative analysis with the more researched function fitting methods. The conclusion is that: (1) the numerical calculating method based on creep model is feasible to predict the post-construction settlement; (2) the method can predict the settlement trend with any time starting point; (3) the method can predict the settlement with relatively less actually measured data so as to saving project cycle.
引用
收藏
页码:1253 / +
页数:2
相关论文
共 50 条
  • [1] EXPERIMENT OF HIGH-SPEED RAILWAY SUBGRADE SETTLEMENT PREDICTION ANALYSIS
    Zhang, Guangli
    Tan, Qulin
    Li, Leijuan
    [J]. CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 453 - 458
  • [2] Study on Settlement Property and Prediction for High-speed Railway Subgrade
    Feng, Huaiping
    Geng, Huiling
    Ma, Deliang
    Chang, Jianmei
    Li, Lizeng
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2017, 39 (11): : 138 - 143
  • [3] Application of Discrete Grey Model in Settlement Prediction of High-speed Railway
    Nie, Guangyu
    Wen, Hongyan
    Gao, Hong
    Yang, Zhi
    Yang, Ming
    [J]. INTERNATIONAL CONFERENCE ON INTELLIGENT EARTH OBSERVING AND APPLICATIONS 2015, 2015, 9808
  • [4] Probabilistic Analytical Model for Settlement Risk Assessment of High-Speed Railway Subgrade
    Chen, R. P.
    Jiang, P.
    Ye, X. W.
    Bian, X. C.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (03)
  • [5] Settlement limit values for box subgrade of high-speed railway
    Yu, Lei
    Zhu, Zhihui
    Qin, Yu
    Wang, Xiang
    Wang, Yawei
    Zheng, Weiqi
    [J]. Journal of Railway Science and Engineering, 2023, 20 (09) : 3203 - 3216
  • [6] Extended UH model and deformation prediction of high-speed railway subgrade
    Zhang, Kui
    Yao, Yangping
    [J]. TRANSPORTATION GEOTECHNICS, 2023, 39
  • [7] STUDY ON PREDICTION METHODS FOR SUBGRADE SETTLEMENT OF HIGH-SPEED RAILWAY USING GRAY NEURAL NETWORK
    Pu, Xingbo
    Wei, Jing
    Wei, Ping
    Li, Wenfan
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 426 - +
  • [8] Study on Settlement Combination Prediction of High Fill Subgrade in Turnout Area of High-speed Railway Station
    Ma, Xuening
    Chen, Yuyan
    Wang, Xu
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (01): : 105 - 113
  • [9] OPTIMIZATION OF SUBGRADE DIFFERENTIAL SETTLEMENT DETECTION METHOD OF HIGH-SPEED RAILWAY
    Shan, Wendi
    Cai, Xiaopei
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 449 - 453
  • [10] Subgrade settlement of high-speed railway in seasonal frozen soil area
    Zhang, Shuang
    Tang, Chun-An
    Zhang, Xiang-Dong
    [J]. Zhang, S. (wangtaochunyan@126.com), 2013, Northeast University (34): : 1202 - 1205