An Integer Programming Approach for Truck-Shovel Dispatching Problem in Open-Pit Mines

被引:32
|
作者
Zhang, Lijun [1 ]
Xia, Xiaohua [1 ]
机构
[1] Univ Pretoria, Dept Elect Elect & Comp Engn, ZA-0002 Pretoria, South Africa
关键词
truck dispatching; open-pit mine; integer programming;
D O I
10.1016/j.egypro.2015.07.469
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The truck dispatching problem in open-pit mines is formulated into an integer programming problem in order to optimally determine the trip numbers of trucks from a shovel (dump site) to a dump site (shovel). The dispatching result aims to answer the question of where should a truck go so that the production target is achieved with minimum operating cost. An analytic method to determine the optimal fleet size taking advantage of the dispatching result is also presented. It is shown by experiments that the proposed integer programming approach is capable of saving 15.65% truck operating cost than fixed truck assignment policy in the studied homogeneous fleet case. It is also shown that the truck operating cost can be further reduced by proper use of a heterogeneous fleet. (C) 2015 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:1779 / 1784
页数:6
相关论文
共 50 条
  • [1] Research on Selection and Matching of Truck-Shovel in Oversized Open-Pit Mines
    Xu, Hai
    Liu, Fuchun
    Liao, Jiangnan
    Liu, Taoying
    [J]. APPLIED SCIENCES-BASEL, 2023, 13 (06):
  • [2] Optimization of truck-shovel allocation in open-pit mines under uncertainty: a chance-constrained goal programming approach
    Mohtasham, Mehrnaz
    Mirzaei-Nasirabad, Hossein
    Alizadeh, Behrooz
    [J]. MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2021, 130 (02) : 81 - 100
  • [3] ON IMPROVING TRUCK SHOVEL PRODUCTIVITY IN OPEN-PIT MINES
    WHITE, JW
    OLSON, JP
    VOHNOUT, SI
    [J]. CIM BULLETIN, 1993, 86 (973): : 43 - 49
  • [4] A Multiagent System for Truck Dispatching in Open-pit Mines
    Icarte, Gabriel
    Berrios, Paulina
    Castillo, Raul
    Herzog, Otthein
    [J]. DYNAMICS IN LOGISTICS (LDIC 2020), 2020, : 363 - 373
  • [5] Real-time truck dispatching in open-pit mines
    Wang, Xiaowei
    Dai, Qi
    Bian, Yougang
    Xie, Guotao
    Xu, Biao
    Yang, Zeyu
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023, 37 (07) : 504 - 523
  • [6] An Agent-based System for Truck Dispatching in Open-pit Mines
    Icarte Ahumada, Gabriel
    Riveros, Eduardo
    Herzog, Otthein
    [J]. ICAART: PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON AGENTS AND ARTIFICIAL INTELLIGENCE, VOL 1, 2020, : 73 - 81
  • [7] Determination of Truck-Shovel Configuration of Open-Pit Mine: A Simulation Method Based on Mathematical Model
    Zhang, Yuhao
    Zhao, Ziyu
    Bi, Lin
    Wang, Liming
    Gu, Qing
    [J]. SUSTAINABILITY, 2022, 14 (19)
  • [8] A Dynamic Scheduling Multiagent System for Truck Dispatching in Open-Pit Mines
    Ahumada, Gabriel Icarte
    Pinto, Jean Diaz
    Herzog, Otthein
    [J]. AGENTS AND ARTIFICIAL INTELLIGENCE, ICAART 2020, 2021, 12613 : 132 - 148
  • [9] Estimation of truck-shovel dispatching in Cao Son Open-Pit coal mine and the ability in applying information technology for increasing its efficiency
    Van Hoa Pham
    Xuan Nam Bui
    Van Quyen Le
    Thi Thu Hoa Le
    Van Viet Pham
    [J]. INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2019, (02): : 21 - 27
  • [10] Truck-shovel allocation optimisation: a goal programming approach
    Upadhyay, S. P.
    Askari-Nasab, H.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2016, 125 (02): : 82 - 92