共 50 条
- [1] An Integer Programming Approach for Truck-Shovel Dispatching Problem in Open-Pit Mines [J]. CLEAN, EFFICIENT AND AFFORDABLE ENERGY FOR A SUSTAINABLE FUTURE, 2015, 75 : 1779 - 1784
- [2] Truck-shovel allocation optimisation: a goal programming approach [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2016, 125 (02): : 82 - 92
- [3] Research on Selection and Matching of Truck-Shovel in Oversized Open-Pit Mines [J]. APPLIED SCIENCES-BASEL, 2023, 13 (06):
- [4] ON IMPROVING TRUCK SHOVEL PRODUCTIVITY IN OPEN-PIT MINES [J]. CIM BULLETIN, 1993, 86 (973): : 43 - 49
- [7] An Optimization Approach for Shovel Allocation to Minimize Fuel Consumption in Open-pit Mines: Case of Heterogeneous Fleet of Shovels [J]. IFAC PAPERSONLINE, 2019, 52 (14): : 207 - 212
- [10] Operation Quality Indicators for Shovel-Truck Systems at Open-Pit Coal Mines [J]. IVTH INTERNATIONAL INNOVATIVE MINING SYMPOSIUM, 2019, 105