Detection and Correction of Buffer Occupancy Data Error in Two-Machine Bernoulli Serial Lines

被引:0
|
作者
Zhu, Tianyu [1 ]
Zhang, Liang [1 ]
机构
[1] Univ Connecticut, Dept Elect & Comp Engn, Storrs, CT 06269 USA
关键词
PERFORMANCE EVALUATION; TRANSIENT ANALYSIS;
D O I
10.1109/CASE49997.2022.9926481
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
As the manufacturing industry transforms its practice to adapt to the Industry 4.0 era, various new technologies are deployed on the factory floor. With these technologies, more production data are being generated and collected. On the other hand, development of analytics tools to digest these factory floor data and extract useful information for production decision-making and control has been lagging behind. Moreover, due to technological limitations of the sensors and the noisy environment in manufacturing facilities, it is quite common that the raw data collected from the factory floor contain errors and often must go through a time-consuming, labor-intensive data cleaning process before they are ready to be fed to any analytics tools. This is one of the main challenges and concerns about effective use of factory floor production data in practice. In this paper, we focus on the buffer occupancy time series data of a production system (i.e., the number of parts in each buffer at every time point). Specifically, we study the buffer occupancy data in two-machine Bernoulli serial lines that are subject to noise and develop an effective algorithm to automatically detect and correct errors in these data. Numerical experiments show that the proposed method is capable of restoring data integrity and significantly improving system performance estimation accuracy using the corrected data.
引用
收藏
页码:1854 / 1859
页数:6
相关论文
共 50 条
  • [31] On permutation schedules for two-machine flow shops with buffer constraints and constant processing times on one machine
    Geser, Philine
    Le, Hoang Thanh
    Hartmann, Tom
    Middendorf, Martin
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (02) : 593 - 601
  • [32] Performance Analysis of Bernoulli Serial Production Lines with Switch-On/Off Machine Control
    Jia, Zhiyang
    Zhang, Liang
    Arinez, Jorge
    Xiao, Guoxian
    [J]. 2015 INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2015, : 477 - 482
  • [33] An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer
    Agnetis, A
    Rossi, F
    Gristina, G
    [J]. NAVAL RESEARCH LOGISTICS, 1998, 45 (02) : 141 - 164
  • [34] Stochastic maintenance opportunity windows for unreliable two-machine one-buffer system
    Lee, Seungchul
    Gu, Xi
    Ni, Jun
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2013, 40 (13) : 5385 - 5394
  • [35] Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance
    Fitouhi, Mohamed-Chahir
    Nourelfath, Mustapha
    Gershwin, Stanley B.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 166 : 61 - 72
  • [36] DATA ERROR-DETECTION AND CORRECTION
    WATKINSON, JR
    [J]. WIRELESS WORLD, 1983, 89 (1565): : 44 - 48
  • [37] Error Detection and Correction in Data Collection
    Challinor, Julia
    [J]. INTERNATIONAL JOURNAL OF ANTIMICROBIAL AGENTS, 2005, 26 : S63 - S63
  • [38] Performance evaluation and inventory control of two-machine assembly lines with parts inventories
    Cui, Penghao
    Li, Cheng
    Jiang, Zhongzhong
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2024, 30 (01): : 289 - 299
  • [39] Performance Analysis of Bernoulli Serial Lines With Small Batch Production and Machine Switch On/Off Control
    Jia, Zhiyang
    Tian, Xiuxuan
    Wang, Zunjun
    Wang, Gang
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024,
  • [40] GANTRY SCHEDULING FOR TWO-MACHINE ONE-BUFFER COMPOSITE WORK CELL BY REINFORCEMENT LEARNING
    Arinez, Jorge
    Ou, Xinyan
    Chang, Qing
    [J]. PROCEEDINGS OF THE ASME 12TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE - 2017, VOL 4, 2017,