Experimental study on dynamic performance of typical nonballasted track systems using a full-scale test rig

被引:29
|
作者
Wang, Mingze [1 ]
Cai, Chengbiao [1 ]
Zhu, Shengyang [1 ]
Zhai, Wanming [1 ]
机构
[1] Southwest Jiaotong Univ, Train & Track Res Inst, State Key Lab Tract Power, Chengdu 610031, Peoples R China
关键词
Nonballasted track; dynamic performance; wheel-drop load; full-scale test rig; dynamic stiffness; SLAB TRACK; HIGH-SPEED; SOIL;
D O I
10.1177/0954409716634751
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents an experimental study on dynamic performance of China Railway Track System (CRTS) series track systems using a full-scale test rig. The test rig has been constructed based on 55.17m long full-scale nonballasted tracks composed of four typical CRTS track elements in high-speed railways. First, the dynamic characteristics of different nonballasted tracks are investigated by conducting wheel-drop tests, where a wheel-drop testing vehicle with a dropping wheelset is devised to provide the wheel-drop load. The vibration levels of different track systems are assessed by the root-mean-square acceleration per one-third octave band, and the vibration transmission characteristics of the CRTS series tracks are evaluated by transfer functions. Further, a mathematical track model is used to extract the dynamic stiffness and damping coefficient of the four types of nonballasted track systems based on the wheel-rail impact response. The vibration characteristics, the dynamic stiffness, and damping coefficient of different nonballasted track systems under various wheel-drop heights are compared and discussed in detail.
引用
收藏
页码:470 / 481
页数:12
相关论文
共 50 条
  • [41] Dynamic train/track/ballast interaction - Computer models and full-scale experiments
    Oscarsson, J
    Dahlberg, T
    VEHICLE SYSTEM DYNAMICS, 1998, 29 : 73 - 84
  • [42] Wheel wear performance assessment and model validation using Harold full scale test rig
    Boyacioglu, Pelin
    Bevan, Adam
    Allen, Paul
    Bryce, Barnaby
    Foulkes, Sam
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2022, 236 (04) : 406 - 417
  • [43] Test System Development and Experimental Study on the Fatigue of a Full-Scale Steel Catenary Riser
    Yu, Jianxing
    Wang, Fucheng
    Yu, Yang
    Liu, Xin
    Liu, Pengfei
    Su, Yefan
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (09)
  • [44] A Full-Scale Study on Preozonation of Typical Source Waters in North China
    Yue, Shangchao
    Wang, Qishan
    Li, Sisi
    Zhang, Yiran
    Liu, Yanfang
    Lu, Jinfeng
    BIOTECHNOLOGY, CHEMICAL AND MATERIALS ENGINEERING, PTS 1-3, 2012, 393-395 : 1084 - 1088
  • [45] Full-scale fire test of various exterior wall systems
    Christensen, Gert L.
    ASTM Special Technical Publication, 1995, (1187): : 27 - 36
  • [46] Performance of a spray system in a full-scale tunnel fire test
    Chang, Hue-Pei
    Ho, San-Ping
    Chen, Chao-Shi
    Chien, Shen-Wen
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 67 : 167 - 174
  • [47] INVESTIGATING LOW-PRESSURE CYLINDERS OF HIGH-CAPACITY STEAM-TURBINES ON A FULL-SCALE EXPERIMENTAL TEST RIG
    RYZHKOV, VK
    VOLCHKOV, VI
    KOTOV, YV
    OGURTSOV, AP
    KOLOMEITSEVA, IL
    NOVOZHILOV, VG
    THERMAL ENGINEERING, 1973, 20 (03) : 6 - 9
  • [48] Fatigue strength evaluation of a bogie frame for urban maglev train with fatigue test on full-scale test rig
    Han, Jeong-Woo
    Kim, Jae-Dong
    Song, See-Yeob
    ENGINEERING FAILURE ANALYSIS, 2013, 31 : 412 - 420
  • [49] Experimental and Numerical Study of Airflows in a Full-Scale Room
    Jiang, Jianbo
    Wang, Xinlei
    Sun, Yigang
    Zhang, Yuanhui
    ASHRAE TRANSACTIONS 2009, VOL 115, PT 2, 2009, 115 : 867 - +
  • [50] Experimental and numerical study on progressive flooding in full-scale
    Ruponen, P.
    Kurvinen, P.
    Saisto, I.
    Harras, J.
    Transactions of the Royal Institution of Naval Architects Part A: International Journal of Maritime Engineering, 2011, 153 (01):