Hydrodynamic and water quality modeling for gate operation: A case study for the Seonakdong River basin in Korea

被引:7
|
作者
Hwang, Jin Young [1 ]
Kim, Young Do [2 ]
Kwon, Jae Hyun [3 ]
Park, Jae Hyeon [4 ]
Noh, Joon Woo [5 ]
Yi, Yong Kon [1 ]
机构
[1] Gyeongnam Dev Inst, Chang Won 641728, South Korea
[2] Inje Univ, Dept Environm Sci & Engn, Nakdong River Environm Res Ctr, Gimhae 621749, South Korea
[3] Inje Univ, Dept Environm Sci & Engn, Gimhae 621749, South Korea
[4] Inje Univ, Dept Civil & Urban Engn, Gimhae 621749, South Korea
[5] Korea Inst Water & Environm, K Water, Taejon 305730, South Korea
基金
新加坡国家研究基金会;
关键词
Seonakdong River; reservoir-like river; gate operation; QUAL2E; CE-QUAL-RIV1;
D O I
10.1007/s12205-013-0025-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Seonakdong River is an impound stream whose flowrate is controlled by the Daejeo and Noksan gates. Therefore, constant natural flow of the Seonakdong River does not occur. In contrast, pollutant loadings occur constantly occurring as water flows into the river from the watershed. The Daejeo gate is located at the upstream head and the Noksan gate is at the downstream end of the Seonakdong River. The Seonakdong River is an estuarine tributary of the Nakdong River. It is a reservoir-like river used for agricultural irrigation, with the Noksan gate at the river mouth serving to prevent the intrusion of saline water. In this study, a steadystate model, QUAL2E, and an unsteady-state model, CE-QUAL-RIV1, were chosen for comparative simulations. The results of the simulations of river water quality changes were verified with respect to short-term variations of water quality due to the increasing water flow from the Daejeo gate and the discharging flow from the Noksan gate. Field measurements were performed to monitor the flowrate and water quality during the operation of the Daejeo and Noksan gates in the Seonakdong River. The general trend observed is that the water quality worsens after the opening of the gates. The reduction in water quality ranges from 3% to 38%. These results show that the gate operators should carefully select the most appropriate operating plan to obtain better water quality in the Seonakdong River. The numerical simulation shows that a discharge of 300 CMS, which is a peak inflow from the Daejeo water gate to the river, can make it possible to achieve the target water quality of the Seonakdong River if the Daejeo water gate can remain open in connection with the Noksan water gate operation.
引用
收藏
页码:73 / 80
页数:8
相关论文
共 50 条
  • [21] River water quality assessment using environmentric techniques: case study of Jakara River Basin
    Mustapha, Adamu
    Aris, Ahmad Zaharin
    Juahir, Hafizan
    Ramli, Mohammad Firuz
    Kura, Nura Umar
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2013, 20 (08) : 5630 - 5644
  • [22] Water quality management options for a downstream transboundary river basin -: The Sajo River case study
    Fehér, J
    Galambos, I
    Lehoczki, Z
    WATER SCIENCE AND TECHNOLOGY, 1999, 40 (10) : 95 - 102
  • [23] WATER-QUALITY MANAGEMENT IN THE YODO RIVER BASIN - CASE-STUDY
    GODA, T
    NAKANISHI, H
    WATER SCIENCE AND TECHNOLOGY, 1991, 23 (1-3) : 65 - 74
  • [24] MODELING WATER QUALITY IN RIVERS: A CASE STUDY OF BEYLERDERESI RIVER IN TURKEY
    Yuceer, M.
    Coskun, M. A.
    APPLIED ECOLOGY AND ENVIRONMENTAL RESEARCH, 2016, 14 (01): : 383 - 395
  • [25] Water quality modeling in the basin of the Piracicaba River (MG), Brazil
    Pires de Melo Silva, Mayte Maria Abreu
    Faria, Sergio Donizete
    Moura, Priscilla Macedo
    ENGENHARIA SANITARIA E AMBIENTAL, 2017, 22 (01) : 133 - 143
  • [26] Hydrologic and Water Quality Modeling of Lower Nestos River Basin
    I. Boskidis
    G. D. Gikas
    G. K. Sylaios
    V. A. Tsihrintzis
    Water Resources Management, 2012, 26 : 3023 - 3051
  • [27] Hydrologic and Water Quality Modeling of Lower Nestos River Basin
    Boskidis, I.
    Gikas, G. D.
    Sylaios, G. K.
    Tsihrintzis, V. A.
    WATER RESOURCES MANAGEMENT, 2012, 26 (10) : 3023 - 3051
  • [28] Hydrodynamic Modeling for Flood Hazard Assessment in a Data Scarce Region: a Case Study of Bharathapuzha River Basin
    Xavier K. Jacob
    Deepak Singh Bisht
    Chandranath Chatterjee
    Narendra Singh Raghuwanshi
    Environmental Modeling & Assessment, 2020, 25 : 97 - 114
  • [29] Hydrodynamic Modeling for Flood Hazard Assessment in a Data Scarce Region: a Case Study of Bharathapuzha River Basin
    Jacob, Xavier K.
    Bisht, Deepak Singh
    Chatterjee, Chandranath
    Raghuwanshi, Narendra Singh
    ENVIRONMENTAL MODELING & ASSESSMENT, 2020, 25 (01) : 97 - 114
  • [30] Application of CCME Water Quality Index to Monitor Water Quality: A Case Study of the Mackenzie River Basin, Canada
    Ashok Lumb
    Doug Halliwell
    Tribeni Sharma
    Environmental Monitoring and Assessment, 2006, 113 : 411 - 429