RAMS analysis: How reliability engineer and risk analysis tools can be applied to improve asset management on train life cycle

被引:0
|
作者
Calixto, E. [1 ]
机构
[1] Bombardier Transportat, Berlin, Germany
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
RAMS analysis has main objective to define system availability, reliability and maintainability regarding critical equipment failures and safety issues like incidents and accidents which impact on system availability and employees health. On most of industries, the reliability diagram block is applied to model the complex systems. Regarding safety, in many cases, incidents are results of combined events which are better modeled by Fault three analyses. Nowadays the RAMS process phases is very well described in EN50126 by "V Diagram" regarding which activities is necessary in railways life cycle phases. Nevertheless, it is not clear which are the specific reliability engineer methods which must be applied in order to achieve high performance a long railways life cycle. The methodology described on EN50126 does not consider such application and integration of RBD and FTA as well as Monte Carlo Simulation. In addition, it is no mentioned others reliability engineer tools like accelerated test, growth analysis, Life cycle analysis a long enterprises life cycle. Furthermore, regarding Safety, the Preliminary Hazard Analysis has been the most qualitative risk analysis applied to define hazard events but in most of cases such events are not quantified by FTA and when such events are modeled do not take into account the incidents effect on system availability. On Transportation Industry, the RAMS process analysis carries out RAM and safety access separately. This paper propose to integrate incident and equipment failures which affect System availability by RBD and FTA model and Monte Carlo Simulation in order to find out all events that causing System unavailability as well as define all incidents events which cause employees health damage. Thus, a case study will be carried out to exemplify Integrated RAMS analysis Methodology applied to Train system in project phase regarding Reliability Diagram Block, FMECA and FTA which model equipment failures and incident which impact in System availability. Such incidents modeled by FTA are integrated in Reliability diagram block. Therefore it'll be possible to compare system availability and reliability without and with incidents as well as identify equipment and event bad actors to improve system availability and safety error. In addition such methods can be carried on in also in operational phases in order to keep system high performance.
引用
收藏
页码:1773 / 1780
页数:8
相关论文
共 50 条
  • [41] How the Failure to Account for Flexibility in the Economic Analysis of Flood Risk and Coastal Management Strategies Can Result in Maladaptive Decisions
    Gersonius, B.
    Morselt, T.
    van Nieuwenhuijzen, L.
    Ashley, R.
    Zevenbergen, C.
    JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2012, 138 (05) : 386 - 393
  • [42] Can Carbon Nanomaterials Improve CZTS Photovoltaic Devices? Evaluation of Performance and Impacts Using Integrated Life-Cycle Assessment and Decision Analysis
    Scott, Ryan P.
    Cullen, Alison C.
    Fox-Lent, Cate
    Linkov, Igor
    RISK ANALYSIS, 2016, 36 (10) : 1916 - 1935
  • [43] Risk Management Effect Analysis of Old Industrial Building Transformation Based on Bow-Tie Model in Whole Life Cycle
    Wu, Zenghai
    Wu, Qian
    Yuan, Hai
    PROCEEDINGS OF THE 8TH ANNUAL MEETING OF RISK ANALYSIS COUNCIL OF CHINA ASSOCIATION FOR DISASTER PREVENTION (RAC 2018), 2018, 66 : 623 - 628
  • [44] How long can Octopus vulgaris live? An extended life cycle in southern Tunisian coasts from age estimation using stylet analysis
    Nafkha, Basma
    Rocha, Francisco
    Ben Abdallah-Ben Hadj Hamida, Olfa
    Ben Hadj Hamida, Nader
    Chemmam, Bachra
    Velasco, Cristina
    Ezzeddine-Najai, Soufia
    Jarboui, Othman
    CAHIERS DE BIOLOGIE MARINE, 2019, 60 (03): : 243 - 252
  • [45] Why using different Life Cycle Assessment software tools can generate different results for the same product system? A cause-effect analysis of the problem
    Lopes Silva, Diogo Aparecido
    Nunes, Andrea Oliveira
    Piekarski, Cassiano Moro
    da Silva Moris, Virginia Aparecida
    Marcal de Souza, Luri Shirosaki
    Rodrigues, Thiago Oliveira
    SUSTAINABLE PRODUCTION AND CONSUMPTION, 2019, 20 : 304 - 315
  • [46] Human reliability-an analysis of proportional success x fails scenarios for adjusting assessment and management risk to reality-applied to hydroeletrical energy generation
    Figueiroa, C. L. S.
    Assis, E. M.
    Lima, G. C.
    Fleming, P. V.
    Freitas, I.
    Garcia, A. C.
    SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 375 - 382
  • [47] Combining risk assessment, life cycle assessment, and multi-criteria decision analysis to estimate environmental aspects in environmental management system
    Liu, Kevin Fong-Rey
    Ko, Chih-Yuan
    Fan, Chihhao
    Chen, Cheng-Wu
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2012, 17 (07): : 845 - 862
  • [48] Combining risk assessment, life cycle assessment, and multi-criteria decision analysis to estimate environmental aspects in environmental management system
    Kevin Fong-Rey Liu
    Chih-Yuan Ko
    Chihhao Fan
    Cheng-Wu Chen
    The International Journal of Life Cycle Assessment, 2012, 17 : 845 - 862
  • [49] Radiomics Analysis of [18F]FDG PET/CT Thyroid Incidentalomas: How Can It Improve Patients' Clinical Management? A Systematic Review from the Literature
    Gherghe, Mirela
    Lazar, Alexandra Maria
    Mutuleanu, Mario-Demian
    Stanciu, Adina Elena
    Martin, Sorina
    DIAGNOSTICS, 2022, 12 (02)
  • [50] Long-Term Self-Management of Vaginal Cube Pessaries Can Improve Sexual Life in Patients with Pelvic Organ Prolapse, Results from a Secondary Analysis
    Nemeth, Zoltan
    Vida, Peter
    Markovic, Predrag
    Gubas, Peter
    Kovacs, Kalman
    Farkas, Balint
    INTERNATIONAL UROGYNECOLOGY JOURNAL, 2024, 35 (12) : 2329 - 2334