RAMS analysis: How reliability engineer and risk analysis tools can be applied to improve asset management on train life cycle

被引:0
|
作者
Calixto, E. [1 ]
机构
[1] Bombardier Transportat, Berlin, Germany
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
RAMS analysis has main objective to define system availability, reliability and maintainability regarding critical equipment failures and safety issues like incidents and accidents which impact on system availability and employees health. On most of industries, the reliability diagram block is applied to model the complex systems. Regarding safety, in many cases, incidents are results of combined events which are better modeled by Fault three analyses. Nowadays the RAMS process phases is very well described in EN50126 by "V Diagram" regarding which activities is necessary in railways life cycle phases. Nevertheless, it is not clear which are the specific reliability engineer methods which must be applied in order to achieve high performance a long railways life cycle. The methodology described on EN50126 does not consider such application and integration of RBD and FTA as well as Monte Carlo Simulation. In addition, it is no mentioned others reliability engineer tools like accelerated test, growth analysis, Life cycle analysis a long enterprises life cycle. Furthermore, regarding Safety, the Preliminary Hazard Analysis has been the most qualitative risk analysis applied to define hazard events but in most of cases such events are not quantified by FTA and when such events are modeled do not take into account the incidents effect on system availability. On Transportation Industry, the RAMS process analysis carries out RAM and safety access separately. This paper propose to integrate incident and equipment failures which affect System availability by RBD and FTA model and Monte Carlo Simulation in order to find out all events that causing System unavailability as well as define all incidents events which cause employees health damage. Thus, a case study will be carried out to exemplify Integrated RAMS analysis Methodology applied to Train system in project phase regarding Reliability Diagram Block, FMECA and FTA which model equipment failures and incident which impact in System availability. Such incidents modeled by FTA are integrated in Reliability diagram block. Therefore it'll be possible to compare system availability and reliability without and with incidents as well as identify equipment and event bad actors to improve system availability and safety error. In addition such methods can be carried on in also in operational phases in order to keep system high performance.
引用
收藏
页码:1773 / 1780
页数:8
相关论文
共 50 条
  • [1] Suitability of life cycle cost analysis (LCCA) as asset management tools for institutional buildings
    Kshirsagar, Anurag
    El-Gafy, Mohamed
    Abdelhamid, Tariq
    JOURNAL OF FACILITIES MANAGEMENT, 2010, 8 (03) : 162 - +
  • [2] Geotechnical Asset Management Plan Analysis of Life-Cycle Cost and Risk
    Thompson, Paul D.
    Beckstrand, Darren
    Mines, Aine
    Vessely, Mark
    Stanley, David
    Benko, Barry
    TRANSPORTATION RESEARCH RECORD, 2016, (2596) : 36 - 43
  • [3] Risk and decision analysis techniques applied to complex facility asset management
    Liming, JK
    Dykes, AA
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 573 - 578
  • [4] How Network Analysis Can Improve the Reliability of Modern Software Ecosystems
    Boldi, Paolo
    2019 IEEE FIRST INTERNATIONAL CONFERENCE ON COGNITIVE MACHINE INTELLIGENCE (COGMI 2019), 2019, : 168 - 172
  • [5] Enhancing decisions with life cycle analysis for risk management
    Ping-Feng Pai
    Ming-Fu Hsu
    Lin Lin
    Neural Computing and Applications, 2014, 24 : 1717 - 1724
  • [6] Enhancing decisions with life cycle analysis for risk management
    Pai, Ping-Feng
    Hsu, Ming-Fu
    Lin, Lin
    NEURAL COMPUTING & APPLICATIONS, 2014, 24 (7-8): : 1717 - 1724
  • [7] Analysis of engines life cost to control and improve yachts management and reliability
    Radica, G.
    Racic, N.
    Kasum, J.
    MANAGEMENT OF NATURAL RESOURCES, SUSTAINABLE DEVELOPMENT AND ECOLOGICAL HAZARDS III, 2012, 148 : 603 - 610
  • [8] New Technology Tools and Life Cycle Analysis (LCA) Applied to a Sustainable Livestock Production
    D'Agaro, Edo
    Rosa, Franco
    Akentieva, Natalia P.
    EUROBIOTECH JOURNAL, 2021, 5 (03): : 130 - 141
  • [9] HOW TIME AND COST ANALYSIS CAN BE USED TO IMPROVE AGENCY MANAGEMENT
    JONES, LH
    CHILD WELFARE, 1970, 49 (07) : 395 - 399
  • [10] Variance analysis applied to a stroke pathway: How this can improve efficiency of healthcare delivery
    Widjaja, LS
    Chan, BP
    Chen, H
    Ong, BKC
    Pang, YT
    ANNALS ACADEMY OF MEDICINE SINGAPORE, 2002, 31 (04) : 425 - 430