Risk-informed approach for design optimization during low power and shutdown operation

被引:2
|
作者
Oh, Ji-Yong [1 ]
Hwang, Seok-Won [1 ]
机构
[1] Korea Hydro & Nucl Power Co Ltd, 25-1 Jang Dong, Daejeon 305343, South Korea
关键词
PRA; LPSD; Mid-loop; SDC;
D O I
10.1016/j.anucene.2019.02.039
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
APR+ has been developed in Korea since 2007. APR+ adopts various advanced safety features including passive auxiliary feedwater system, four emergency diesel generators. Through the implementation of the advanced designs, APR+ increased the safety to the world best level of evolutionary reactors. The full power core damage frequency or containment failure frequency decreased significantly comparing to APR1400 that is base model of APR+. However, low-power shutdown risk has not been improved substantially. This paper suggests several design changes that optimize low-power shutdown risk. Based on the design alternatives, this paper discusses risk effectiveness of the proposed design including various factors, e.g. equipment reliability, human error, training, procedure and so on. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:293 / 300
页数:8
相关论文
共 50 条
  • [1] Risk-Informed Preventive Maintenance Optimization
    Tutt, Teresa E.
    Singh, Inderjeet
    Popova, Elmira
    Kee, Ernie
    2012 PROCEEDINGS - ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2012,
  • [2] Quantitative Risk-Informed Design of Levees
    Sibley, Heather M.
    Vroman, Noah D.
    Shewbridge, Scott E.
    GEO-RISK 2017: IMPACT OF SPATIAL VARIABILITY, PROBABILISTIC SITE CHARACTERIZATION, AND GEOHAZARDS, 2017, (284): : 76 - 90
  • [3] RISK-INFORMED AND DEFENSE-IN-DEPTH ORIENTED PLANT DESIGN APPROACH
    Morota, Hidetsugu
    Suzuki, Hiroshi
    Sakihama, Takashi
    Nasif, Hesham R.
    Sano, Hiroshi
    PROCEEDINGS OF THE 20TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING AND THE ASME 2012 POWER CONFERENCE - 2012, VOL 2, 2012, : 407 - 422
  • [4] Risk-informed design of advanced nuclear reactor: A target unavailability approach
    Castillo-Hernandez, Orestes
    Perdomo-Ojeda, P. E. Manuel
    Grantom, C. R.
    Nelson, Pamela F.
    NUCLEAR ENGINEERING AND DESIGN, 2024, 416
  • [5] APPLICATION OF RISK-INFORMED METHODS TO IMPROVE PLANT OPERATION AT KOZLODUY NUCLEAR POWER PLANT
    Kichev, Emil
    Ivanov, Ivan
    Mancheva, Kaliopa
    Petrov, Yasen
    Vladimirova, Vesselina
    ICONE 17: PROCEEDINGS OF THE 17TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, VOL 1, 2009, : 119 - 132
  • [6] Risk-informed integrated design optimization for offshore wind farm electrical systems
    Liu, Min
    Lu, Da-Gang
    Qin, Jianjun
    Miao, Yi-Zhi
    Zhang, Wei-Heng
    Zhu, Jiang-Sheng
    Faber, Michael Havbro
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 250
  • [7] A risk-informed approach to coastal zone management
    Jongejan, R. B.
    Ranasinghe, R.
    Vrijling, J. K.
    Callaghan, D.
    AUSTRALIAN JOURNAL OF CIVIL ENGINEERING, 2011, 9 (01) : 47 - 60
  • [8] A risk-informed approach to safety margins analysis
    Smith, Curtis
    Mandelli, Diego
    NUCLEAR ENGINEERING INTERNATIONAL, 2013, 58 (707): : 38 - 40
  • [9] A PRA approach to evaluate post-fire safe shutdown capacity for risk-informed fire analysis in Taiwan
    Wu, CH
    Lin, TJ
    Kao, TM
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 2487 - 2492
  • [10] Current trends in risk-informed changes to limiting conditions for operation
    Martorell, S
    Villanueva, JF
    Nebot, Y
    Carlos, S
    Serradell, V
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 707 - 713