Moving horizon approach of integrating scheduling and control for sequential batch processes

被引:46
|
作者
Chu, Yunfei [1 ]
You, Fengqi [1 ]
机构
[1] Northwestern Univ, Dept Chem & Biol Engn, Evanston, IL 60208 USA
关键词
scheduling; advanced manufacturing; mixed-integer dynamic optimization; model predictive control; batch processes; ENTERPRISE-WIDE OPTIMIZATION; CLOSED-LOOP IMPLEMENTATION; DYNAMIC OPTIMIZATION; MIXED-INTEGER; ROLLING-HORIZON; MINLP MODELS; UNCERTAINTY; ALGORITHM; HEURISTICS; NETWORKS;
D O I
10.1002/aic.14359
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Online integration of scheduling and control is crucial to cope with process uncertainties. We propose a new online integrated method for sequential batch processes, where the integrated problem is solved to determine controller references rather than process inputs. Under a two-level feedback loop structure, the integrated problem is solved in a frequency lower than that of the control loops. To achieve the goal of computational efficiency and rescheduling stability, a moving horizon approach is developed. A reduced integrated problem in a resolving horizon is formulated, which can be solved efficiently online. Solving the reduced problem only changes a small part of the initial solution, guaranteeing rescheduling stability. The integrated method is demonstrated in a simulated case study. Under uncertainties of the control system disruption and the processing unit breakdown, the integrated method prevents a large loss in the production profit compared with the simple shifted rescheduling solution. (c) 2014 American Institute of Chemical Engineers AIChE J, 60: 1654-1671, 2014
引用
收藏
页码:1654 / 1671
页数:18
相关论文
共 50 条
  • [1] Integration of Scheduling & Control for Sequential Batch Processes: An Iterative Approach
    Misra, Shamik
    Gudi, Ravindra D.
    [J]. IFAC PAPERSONLINE, 2018, 51 (01): : 84 - 89
  • [2] Moving-horizon Method for Integrating Scheduling and Control
    Chu, Yunfei
    You, Fengqi
    [J]. 2014 AMERICAN CONTROL CONFERENCE (ACC), 2014, : 2948 - 2953
  • [3] Integration of scheduling and dynamic optimization for sequential batch processes
    Chu, Yunfei
    You, Fengqi
    [J]. 2013 AMERICAN CONTROL CONFERENCE (ACC), 2013, : 3511 - 3516
  • [4] Integrated Planning, Scheduling, and Dynamic Optimization for Sequential Batch Processes
    Chu, Yunfei
    You, Fengqi
    [J]. 2015 AMERICAN CONTROL CONFERENCE (ACC), 2015, : 5635 - 5640
  • [5] Robust Optimization for Integrated Scheduling of Sequential Batch Processes with Dynamics
    Shi, Hanyu
    You, Fengqi
    [J]. 2015 AMERICAN CONTROL CONFERENCE (ACC), 2015, : 4947 - 4952
  • [6] Scheduling approach for mixed networked batch processes
    Soltan, HAM
    [J]. CURRENT ADVANCES IN MECHANICAL DESIGN AND PRODUCTION VII, 2000, : 603 - 610
  • [7] Integrating Planning and Scheduling in an Oil Refinery with a Rolling Horizon Approach
    Zondervan, Edwin
    Kaland, Michiel
    van Elzakker, Martijn A. H.
    Fransoo, Jan C.
    Meuldijk, Jan
    [J]. 24TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A AND B, 2014, 33 : 439 - 444
  • [8] Moving Horizon Scheduling for Networked Control Systems With Communication Constraints
    Xue, Binqiang
    Li, Ning
    Li, Shaoyuan
    Zhu, Quanmin
    [J]. IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2013, 60 (08) : 3318 - 3327
  • [9] Explicit Moving Horizon Control and Estimation: A Batch Polymerization Case Study
    Sui, Dan
    Feng, Le
    Hovd, Morten
    [J]. ICIEA: 2009 4TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-6, 2009, : 1647 - 1652
  • [10] Integrated Scheduling and Dynamic Optimization of Sequential Batch Processes with Online Implementation
    Chu, Yunfei
    You, Fengqi
    [J]. AICHE JOURNAL, 2013, 59 (07) : 2379 - 2406