Integrated Planning, Scheduling, and Dynamic Optimization for Sequential Batch Processes

被引:0
|
作者
Chu, Yunfei [1 ]
You, Fengqi [1 ]
机构
[1] Northwestern Univ, Dept Chem & Biol Engn, Evanston, IL 60208 USA
关键词
CHALLENGES;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We solve the challenging problem of integrated planning, scheduling, and dynamic optimization for sequential batch processes with fixed batch sizes. The integrated problem is first formulated into a complicated mixed-integer nonlinear programing (MINLP) problem. There are a planning model, multiple scheduling models in planning periods, and a number of dynamic models describing task execution processes. To efficiently solve the complex MINLP problem, we develop an efficient method which separates the subproblems using metamodels to represent the linking functions. Compared to the direct solution approach, the proposed method significantly reduces the computational time.
引用
收藏
页码:5635 / 5640
页数:6
相关论文
共 50 条
  • [1] Integrated Scheduling and Dynamic Optimization of Sequential Batch Processes with Online Implementation
    Chu, Yunfei
    You, Fengqi
    [J]. AICHE JOURNAL, 2013, 59 (07) : 2379 - 2406
  • [2] Integration of scheduling and dynamic optimization for sequential batch processes
    Chu, Yunfei
    You, Fengqi
    [J]. 2013 AMERICAN CONTROL CONFERENCE (ACC), 2013, : 3511 - 3516
  • [3] Robust Optimization for Integrated Scheduling of Sequential Batch Processes with Dynamics
    Shi, Hanyu
    You, Fengqi
    [J]. 2015 AMERICAN CONTROL CONFERENCE (ACC), 2015, : 4947 - 4952
  • [4] Integrated Scheduling and Dynamic Optimization of Network Batch Processes
    Chu, Yunfei
    You, Fengqi
    [J]. 2014 AMERICAN CONTROL CONFERENCE (ACC), 2014, : 5024 - 5029
  • [5] Integrated Scheduling and Dynamic Optimization for Network Batch Processes
    Chu, Yunfei
    You, Fengqi
    [J]. 24TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A AND B, 2014, 33 : 523 - 528
  • [6] Adaptive Surrogate-based Algorithm for Integrated Scheduling and Dynamic Optimization of Sequential Batch Processes
    Shi, Hanyu
    You, Fengqi
    [J]. 2015 54TH IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2015, : 7304 - 7309
  • [7] Integrated Planning, Scheduling, and Dynamic Optimization for Continuous Processes
    Shi, Hanyu
    Chu, Yunfei
    You, Fengqi
    [J]. 2014 IEEE 53RD ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2014, : 388 - 393
  • [8] Integrated scheduling and dynamic optimization of batch processes using state equipment networks
    Nie, Yisu
    Biegler, Lorenz T.
    Wassick, John M.
    [J]. AICHE JOURNAL, 2012, 58 (11) : 3416 - 3432
  • [9] Integrated Planning, Scheduling, and Dynamic Optimization for Batch Processes: MINLP Model Formulation and Efficient Solution Methods via Surrogate Modeling
    Chu, Yunfei
    You, Fengqi
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2014, 53 (34) : 13391 - 13411
  • [10] Integrated optimization model of production planning and scheduling for batch production
    Shang, WL
    Fan, YS
    [J]. SHAPING BUSINESS STRATEGY IN A NETWORKED WORLD, VOLS 1 AND 2, PROCEEDINGS, 2004, : 419 - 421