共 50 条
- [33] Lead Time Distribution in Unreliable Production Lines Processing Perishable Products [J]. 2014 IEEE EMERGING TECHNOLOGY AND FACTORY AUTOMATION (ETFA), 2014,
- [36] Two-echelon inventory model with service level constraint and controllable lead time sensitive to order quantity [J]. Journal of Central South University, 2013, 20 : 3324 - 3333
- [39] Inventory decision and coordination contract design for two-echelon supply chain considering delivery time uncertainty [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2021, 27 (04): : 1211 - 1225