Optimal scheduling of electric vehicle in stochastic AC SCUC problem for large-scale wind power penetration

被引:8
|
作者
Gupta, Pranda Prasanta [1 ]
Jain, Prerna [1 ]
Sharma, Kailash Chand [2 ]
Bhaker, Rohit [1 ]
机构
[1] Malaviya Natl Inst Technol, Dept Elect Engn, Jaipur, Rajasthan, India
[2] Banasthali Vidyapith, Sch Automat, Vanasthali, Rajasthan, India
关键词
benders decomposition; plug-in electric vehicles; stochastic security-constrained unit commitment; wind uncertainty; CONSTRAINED UNIT COMMITMENT; ENERGY-STORAGE; GENERATION; OPERATION; DISPATCH; SYSTEMS; IMPACT;
D O I
10.1002/2050-7038.12145
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Integration of highly volatile wind generation causes reliability and grid issues for system operator (SO). Plug-in electric vehicles (PEVs) are mobile distributed source of active power that provides opportunity to use their battery storage for wind integration. The coordinated integration of wind volatility and PEVs fleet is studied under security-constrained unit commitment (SCUC) model. In this regard, a stochastic SCUC with PEVs considering wind integration and line contingency is proposed. Wind volatility and PEVs driving behavior uncertainty is modeled through Monte Carlo simulations (MCS) of large number of scenarios with associated probabilities. This scenario has been reduced by Kantorovich distance (KD) matrix-based backward reduction technique. Moreover, pre-line and post-line contingency AC optimal power flow is used for network constraints in SCUC (AC SCUC). Due to consideration of N-1 security criteria and wind power scenarios, the proposed model is mixed integer nonlinear programming (MINLP), which is computationally heavy and is thus solved by a two-stage programming Benders decomposition (BD) approach. Different case studies are examined on modified IEEE reliability test system (RTS). Comparative analysis explores the impact on overall operational costs, PEV cost, wind curtailment, and locational marginal price (LMP) for congestion management. Simulation results validate that the proposed model is technoeconomically suitable for large-scale wind power penetration.
引用
下载
收藏
页数:21
相关论文
共 50 条
  • [21] Evaluation of the Impact of Large-Scale Electric Vehicle on Power Grid Economy
    Yang, Fang
    Bai, Cuifen
    Huang, Han
    He, Bo
    Hu, Bo
    2015 INTERNATIONAL CONFERENCE ON SMART GRID AND CLEAN ENERGY TECHNOLOGIES (ICSGCE), 2015, : 164 - 169
  • [22] Impacts of Large-Scale Wind Generators Penetration on the Voltage Stability of Power Systems
    Hossain, M. J.
    Pota, H. R.
    Mahmud, M. A.
    Ramos, Rodrigo A.
    2011 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2011,
  • [23] A novel model of large-scale hydrothermal power system optimal scheduling
    Wang, Z
    He, GY
    Chen, XQ
    Zhou, SX
    2004 IEEE PES POWER SYSTEMS CONFERENCE & EXPOSITION, VOLS 1 - 3, 2004, : 518 - 523
  • [24] LFC with Storage Battery considering SOC for Large-scale Wind Power Penetration
    Toge, Masato
    Kurita, Yu
    Omi, Takuya
    Iwamoto, Shinichi
    2014 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (IEEE PES APPEEC), 2014,
  • [25] Game Theoretical Scheduling of Modern Power Systems with Large-scale Wind Power Integration
    Wei, Wei
    Liu, Feng
    Mei, Shengwei
    2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [26] Two-Stage Optimal Scheduling Strategy for Large-Scale Electric Vehicles
    Wang, Xiuyun
    Sun, Chao
    Wang, Rutian
    Wei, Tianyuan
    IEEE ACCESS, 2020, 8 : 13821 - 13832
  • [27] Two-Stage Optimal Scheduling Strategy for Large-Scale Electric Vehicles
    Wang X.
    Sun C.
    Wang R.
    Wei T.
    Wang, Rutian (wrtmail@163.com), 1600, Institute of Electrical and Electronics Engineers Inc., United States (08): : 13821 - 13832
  • [28] Large-scale Maintenance Scheduling of Wind Turbines
    Liu, Libo
    Zhou, Yifan
    Yan, Bin
    Liu, Jingjing
    2019 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-QINGDAO), 2019,
  • [29] Genetic algorithm for a large-scale scheduling problem in an electric wire production process
    Iima, H
    Sannomiya, N
    GECCO-99: PROCEEDINGS OF THE GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 1999, : 1784 - 1784
  • [30] Real-time stochastic optimal scheduling of large-scale electric vehicles: A multidimensional approximate dynamic programming approach
    Pan, Z. N.
    Yu, T.
    Chen, L. P.
    Yang, B.
    Wang, B.
    Guo, W. X.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2020, 116 (116)