Applications of Fuzzy Critical Chain Method in Project Scheduling

被引:1
|
作者
Zhao, Zhen-Yu [1 ]
You, Wei-Yang [1 ]
Lv, Qian-Lei [1 ]
机构
[1] N China Elect Power Univ, Sch Business Adm, Beijing 102206, Peoples R China
关键词
D O I
10.1109/ICNC.2008.29
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With increasingly fierce competition in the construction market, project management urgently need a feasible, stable and accurate project schedule plan which can be implemented smoothly in a dynamic environment. The traditional methods, such as CPM/PERT, has been unable to deal with the actual project with the uncertain duration and resource constraints. Although some researchers have adopted critical chain method based on the probability theory to deal with resource constraints and uncertainty, statistical data are often in short. This paper develops a fuzzy critical chain project scheduling, consisting of solving resource-constrained project scheduling via improved genetic algorithm, and determining the feeding and project buffer size estimated by fuzzy theory in designed algorithm. The project buffer size can be used to deal with the possible delay of the project. The proposed method is useful for project managers to obtain a feasible, stable and accurate project plan.
引用
收藏
页码:473 / 477
页数:5
相关论文
共 50 条
  • [21] Multi-project robust scheduling based on critical chain
    Liu, Qiong
    Lin, Kui
    Zhang, Chao-Yong
    Zhu, Hai-Ping
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (04): : 813 - 820
  • [22] Quantitative analysis of critical chain multiple project scheduling management
    Ma, Guo-Feng
    You, Jian-Xin
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (09): : 54 - 60
  • [23] A Critical Chain Project Scheduling Problem with Multi-mode
    Peng, W. L.
    Jiao, Q. J.
    ADVANCES IN MATERIALS MANUFACTURING SCIENCE AND TECHNOLOGY XIV, 2012, 697-698 : 541 - 545
  • [24] Project Characteristics Based Buffer Sizing to Critical Chain Scheduling
    Guo Ze
    Zheng Zheng
    Lin ShuMin
    Yang RuiFeng
    PROCEEDINGS OF THE 31ST CHINESE CONTROL CONFERENCE, 2012, : 2400 - 2405
  • [25] Comparison of Fuzzy Buffer Size Algorithms in Critical Chain Scheduling
    Bai, Chunguang
    Gershon, Mark
    Wei, Xiaopeng
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2010, 13 (3B): : 893 - 903
  • [26] Fuzzy project scheduling
    Pan, HQ
    Yeh, CH
    PROCEEDINGS OF THE 12TH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1 AND 2, 2003, : 755 - 760
  • [27] Implementation of Critical Path Method in Project Planning and Scheduling
    Atin, S.
    Lubis, R.
    2ND INTERNATIONAL CONFERENCE ON INFORMATICS, ENGINEERING, SCIENCE, AND TECHNOLOGY (INCITEST 2019), 2019, 662
  • [28] Solving the resource-constrained multi-project scheduling problem with an improved critical chain method
    Tian, Min
    Liu, Ren Jing
    Zhang, Guang Jun
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (08) : 1243 - 1258
  • [29] Improved Critical Chain Project Management Framework for Scheduling Construction Projects
    Ma, Guofeng
    Wang, Aimin
    Li, Nan
    Gu, Lingyun
    Ai, Qi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (12)
  • [30] A fuzzy buffer setting method for project scheduling under uncertainty
    Zhou, Yikun
    ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4, 2013, 291-294 : 2889 - 2894