Research of Risk Control of Public Construction Project Based on Fault Tree

被引:0
|
作者
Chang Liu [1 ]
Luo Fuzhou [1 ]
机构
[1] Xian Univ Architecture & Technol, Sch Management, Xian, Shaanxi, Peoples R China
关键词
Fault Tree Analysis; Project Schedule; Risk Control;
D O I
10.4028/www.scientific.net/AMM.457-458.1682
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
According to characteristics of the project characteristics, fault tree analysis method is adopted and fault tree model is established to decompose the reasons that affect the project schedule layer by layer. Taking a dam construction project as an example, according to the degree of structural order, various factors are explored to calculate the degree of influence of the delay in progress, and the corresponding measures are proposed to control the schedule.
引用
收藏
页码:1682 / 1685
页数:4
相关论文
共 50 条
  • [1] Assessment of grid construction project risk of Process based on fuzzy-event tree-fault tree
    Li, Wei
    Ji, Yanjiao
    Shang, Yumin
    [J]. IEEC 2009: FIRST INTERNATIONAL SYMPOSIUM ON INFORMATION ENGINEERING AND ELECTRONIC COMMERCE, PROCEEDINGS, 2009, : 393 - 397
  • [2] Research in the Risk Control Model of Construction Project Based on Uncertain Theory
    Lin, Feng
    Guan, Jianping
    [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND INDUSTRIAL ENGINEERING, 2011, : 93 - 96
  • [3] Fuzzy Fault Tree Analysis of Power Project Safety Risk for the Smart Construction
    Yang Tai-hua
    Zheng Qing-hua
    Wang Yang
    Wang Su-fang
    [J]. 2012 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 2012, : 372 - 376
  • [4] Risk of TOT Hydropower Project based on Fuzzy Fault Tree
    Hou, Li
    Chen, Qian
    Mao, Dong
    [J]. 2015 INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND ROCK ENGINEERING, ICCERE 2015, 2015, : 558 - 569
  • [5] Research on Risk Control of Logistics Park Construction Project Based on Reliability Theory
    Wang, Yuzhou
    [J]. INTELLIGENT AND INTEGRATED SUSTAINABLE MULTIMODAL TRANSPORTATION SYSTEMS PROCEEDINGS FROM THE 13TH COTA INTERNATIONAL CONFERENCE OF TRANSPORTATION PROFESSIONALS (CICTP2013), 2013, 96 : 2194 - 2200
  • [6] Research on Risk Control Measures in the Process of Project Construction
    Tian Lingang
    Song Yongjia
    Huang Xiang
    Peng Yuanchun
    Liu Zhi
    [J]. PROCEEDINGS OF 2010 INTERNATIONAL SYMPOSIUM ON CONSTRUCTION ECONOMY AND MANAGEMENT (ISCEM2010), 2010, : 114 - 118
  • [7] Research on Construction Risk Control of the Real Estate Development Project
    Ma Zhiqiang
    Guo Hua
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2179 - 2182
  • [8] Pre-Control Study of the Falling Risk in Construction Based on Fault Tree Analysis and a Reason Model
    Yang, Gaosheng
    Xu, Ying
    Zheng, Xiaoli
    Xia, Ningping
    [J]. ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 687 - 695
  • [9] Risk Identification and Analysis of Communication Project Based on Fault Tree: The Case of the Telecom IVR Project
    Bai Xu
    [J]. 12TH ANNUAL MEETING OF CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY ON INFORMATION AND COMMUNICATION TECHNOLOGY AND SMART GRID, 2010, : 607 - 613
  • [10] Risk management of PPP project in the preparation stage based on Fault Tree Analysis
    Xing, Yuanzhi
    Guan, Qiuling
    [J]. 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2017, 59