Risk of TOT Hydropower Project based on Fuzzy Fault Tree

被引:0
|
作者
Hou, Li [1 ]
Chen, Qian [1 ]
Mao, Dong [2 ]
机构
[1] Dalian Neusoft Univ Informat, Dalian 116023, Liaoning, Peoples R China
[2] Dalian Maritime Univ, Dalian 116026, Peoples R China
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The transfer-operate-transfer (TOT) financing mode is a maturing project financing mode that is widely used in the construction and operation of domestic and foreign large-scale projects. The current theoretical research and practical applications of this mode are in the exploration and innovation process. On the basis of the case of the W hydropower project, this study uses the Hall 3D structural model to identify the project risks and the fuzzy fault tree method to quantitatively assess the risks. The measures of the major risks of TOT projects are also given to provide reference value proposals to the project manager.(1)
引用
收藏
页码:558 / 569
页数:12
相关论文
共 50 条
  • [1] Assessment of grid construction project risk of Process based on fuzzy-event tree-fault tree
    Li, Wei
    Ji, Yanjiao
    Shang, Yumin
    [J]. IEEC 2009: FIRST INTERNATIONAL SYMPOSIUM ON INFORMATION ENGINEERING AND ELECTRONIC COMMERCE, PROCEEDINGS, 2009, : 393 - 397
  • [2] A Reliability Risk Analysis Method Based on the Fuzzy Fault Tree and Fuzzy Event Tree
    Quan, Cai
    Lingqiang, Liang
    Dongping, Yu
    Gu, Yingkui
    [J]. PROCEEDINGS OF 2016 11TH INTERNATIONAL CONFERENCE ON RELIABILITY, MAINTAINABILITY AND SAFETY (ICRMS'2016): INTEGRATING BIG DATA, IMPROVING RELIABILITY & SERVING PERSONALIZATION, 2016,
  • [3] Risk Analysis of Hydropower Construction Project based on Fuzzy Corn prehensiveEvaluation
    Wu Yunna
    Hu Zishan
    Xu Ruhang
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2177 - 2181
  • [4] Fuzzy Fault Tree Analysis of Power Project Safety Risk for the Smart Construction
    Yang Tai-hua
    Zheng Qing-hua
    Wang Yang
    Wang Su-fang
    [J]. 2012 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 2012, : 372 - 376
  • [5] Research of Risk Control of Public Construction Project Based on Fault Tree
    Chang Liu
    Luo Fuzhou
    [J]. FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1682 - 1685
  • [6] TOT Project Financing Risk Assessment Based On PCA
    Han, Yong
    Zhao, Hui
    [J]. 2013 3RD INTERNATIONAL CONFERENCE ON APPLIED SOCIAL SCIENCE (ICASS 2013), VOL 1, 2013, : 451 - 455
  • [7] Fuzzy fault diagnosing method based on fault tree
    Yang, Xiao-Chuan
    Xie, Qing-Hua
    He, Jun
    Zhang, Qi
    [J]. Tongji Daxue Xuebao/Journal of Tongji University, 2001, 29 (09): : 1058 - 1060
  • [8] Risk Identification and Analysis of Communication Project Based on Fault Tree: The Case of the Telecom IVR Project
    Bai Xu
    [J]. 12TH ANNUAL MEETING OF CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY ON INFORMATION AND COMMUNICATION TECHNOLOGY AND SMART GRID, 2010, : 607 - 613
  • [9] Risk management of PPP project in the preparation stage based on Fault Tree Analysis
    Xing, Yuanzhi
    Guan, Qiuling
    [J]. 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2017, 59
  • [10] Study on the Structure and Factors of TOT Applied in Water Conservancy and Hydropower Project
    Ma, Li
    Wang, Songjiang
    [J]. AUTOMATION EQUIPMENT AND SYSTEMS, PTS 1-4, 2012, 468-471 : 1564 - 1569