The Koralm Tunnel Project-33 km to connect Europe

被引:0
|
作者
Wagner, H. [1 ]
Keiper, K. [2 ]
Hoelzl, H. [3 ]
Mussger, K. [3 ]
机构
[1] OBB Infrastruktur AG, Graz, Austria
[2] Lombardi Engn Ltd, Minusio, Switzerland
[3] Geoconsult ZT GmbH, Salzburg, Austria
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Koralm Tunnel with an overall length of approx. 33 km and a maximum overburden of about 1200 m represents the core piece of the new high-speed railway line from Graz to Klagenfurt in Austria as part of the Baltic-Adriatic Axis. The Koralm Tunnel is subdivided into three contract sections: KAT 1, KAT 2 and KAT 3. While the mined tunnel works on the first lot KAT 1 with a 2 x 2.3 km tunnel length and five cross passages have been completed, the main lot KAT 2 with a total length of approx. 2 x 20 km, in which 2 x 17 km will be excavated by 2 double shield TBM's, is currently under construction. For lot KAT 3 the tender process has started by the end of 2012. Aside from general project information, this article presents the current state of ongoing construction works and describes challenges of the planning phase as well as key elements of construction.
引用
收藏
页码:233 / 240
页数:8
相关论文
共 13 条
  • [1] Koralm Tunnel Project
    不详
    [J]. BAUINGENIEUR, 2014, 89 : A19 - A19
  • [2] Prediction of performance and cutter wear in rock TBM: application to Koralm tunnel project
    Brino, Gabriele
    Peila, Daniele
    Steidl, Arnold
    Fasching, Florian
    [J]. GEAM-GEOINGEGNERIA AMBIENTALE E MINERARIA-GEAM-GEOENGINEERING ENVIRONMENT AND MINING, 2015, (145): : 37 - 50
  • [3] Norwegian hydropower in greenhouse-neutral Europe: Hydro Connect Project
    [J]. BWK- Energie-Fachmagazin, 2023, 75 (3-4): : 64 - 65
  • [4] 15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel
    Lussu, Andrea
    Grüllich, Sebastian
    Kaiser, Christian
    Fontana, Adrian
    [J]. Geomechanik und Tunnelbau, 2019, 12 (05): : 595 - 603
  • [5] DESIGN AND CONSTRUCTIONAL ASPECTS OF 8.3 KM LONG TUNNEL IN LOWER HIMALAYAS FOR UH1-III-HE PROJECT (INDIA)
    DOGRA, RS
    GOYAL, DP
    [J]. TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 977 - 984
  • [6] The barents ecogeochemistry project -: Ecogeochemical mapping of 1,500,000 km2 in NE-Europe
    Kashulina, G.
    Salminen, R.
    Chekushin, V.
    Bogatyrev, I.
    Tenhola, M.
    Niskavaara, H.
    [J]. GEOCHIMICA ET COSMOCHIMICA ACTA, 2007, 71 (15) : A467 - A467
  • [7] DESIGN AND CONSTRUCTIONAL ASPECTS OF A 30 KM LONG TUNNEL COMPLEX FOR 1500-MW NATHPA-JHAKRI HYDROELECTRIC PROJECT (INDIA)
    GOYAL, DP
    [J]. TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 1015 - 1022
  • [8] Squeezing Assessment Along 2.84-km-Long Headrace Tunnel of a Small Hydropower Project in KPK, Pakistan: Comparison of Different Methods
    Akram, Mian Sohail
    Noor, Aisha
    Ullah, Muhammad Fahad
    Ahmed, Luqman
    Rehman, Faisal
    Ali, Muhammad
    [J]. INTERNATIONAL JOURNAL OF GEOSYNTHETICS AND GROUND ENGINEERING, 2019, 5 (03)
  • [9] Squeezing Assessment Along 2.84-km-Long Headrace Tunnel of a Small Hydropower Project in KPK, Pakistan: Comparison of Different Methods
    Mian Sohail Akram
    Aisha Noor
    Muhammad Fahad Ullah
    Luqman Ahmed
    Faisal Rehman
    Muhammad Ali
    [J]. International Journal of Geosynthetics and Ground Engineering, 2019, 5
  • [10] Metro Barcelona Linea 9 -: Europe's greatest metro project with shield tunnel boring machines of large diameters
    Gabarró, XBI
    Frech, RBI
    Maidl, B
    Della Valle, N
    [J]. (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 637 - 643