DESIGN AND CONSTRUCTIONAL ASPECTS OF A 30 KM LONG TUNNEL COMPLEX FOR 1500-MW NATHPA-JHAKRI HYDROELECTRIC PROJECT (INDIA)

被引:0
|
作者
GOYAL, DP
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
下载
收藏
页码:1015 / 1022
页数:8
相关论文
共 6 条
  • [1] Design of tunnel lining in Tail Race Complex of Nathpa Jhakri Hydroelectric Project
    Chopra, V
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON HYDRO POWER DEVELOPMENT IN HIMALAYAS, 1998, : 423 - 432
  • [2] 1500MW Nathpa Jhakri Hydroelectric Project - Stress relieving aspects in the pressure shafts steel liner
    Arora, V
    Chopra, V
    Goyal, A
    TUNNELLING ASIA '97,- SELECT PAPERS, 1997, : 303 - 312
  • [3] Rock support design for EGG-shaped desilting chambers for 1500 MW Nathpa Jhakri Hydroelectric Project
    Singh, R
    Rao, PDP
    Chauhan, RS
    Dasgupta, B
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON HYDRO POWER DEVELOPMENT IN HIMALAYAS, 1998, : 337 - 346
  • [4] Layout of 400 KV pot head yard for 1500 MW Nathpa Jhakri Hydroelectric Project
    Bisht, V
    Dutta, A
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON HYDRO POWER DEVELOPMENT IN HIMALAYAS, 1998, : 121 - 129
  • [5] A major rock slide and its impact on 1500 MW Nathpa Jhakri Hydel Project in northwest Himalaya, India
    Manhas, GS
    Kumar, A
    LANDSLIDES-BK, 1996, : 1765 - 1769
  • [6] DESIGN AND CONSTRUCTIONAL ASPECTS OF 8.3 KM LONG TUNNEL IN LOWER HIMALAYAS FOR UH1-III-HE PROJECT (INDIA)
    DOGRA, RS
    GOYAL, DP
    TUNNELS AND WATER, VOLS 1-3: WATER AND ITS INFLUENCE ON THE DESIGN, CONSTRUCTION, AND EXPLOITATION OF TUNNELS AND UNDERGROUND WORKS, 1989, : 977 - 984