New approach puts Tube station upgrade back on track

被引:0
|
作者
Sibley, Keith
机构
[1] Tube Lines, United Kingdom
关键词
procurement; public-private partnership; railway systems;
D O I
10.1680/cien.2009.161.1.35
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Tube Lines - a joint-venture company between Amey and Bechtel - is now six years into a 30-year public-private partnership with London Underground to maintain and upgrade all trains and infrastructure on the critical Jubilee, Northern and Piccadilly lines. A total of 550 pound million alone is being spent on upgrading most of the lines' 100 stations. This paper describes how major changes in traditional procurement and working practices over the first few years have resulted in significant productivity improvements, including time and cost reductions of over 30%.
引用
收藏
页码:35 / 41
页数:7
相关论文
共 50 条
  • [31] Frankfurt Trade Fair Back on Track after New Start
    不详
    FLEISCHWIRTSCHAFT, 2023, 103 (01): : 47 - 47
  • [32] BACK ON TRACK IN NEW-JERSEY + THE ARCHITECTURE OF RAILROAD DEPOTS
    COHEN, D
    HISTORIC PRESERVATION, 1989, 41 (02): : 42 - 49
  • [33] New station brings trains back to Auckland's centre
    Maylin, M
    Shanmuganathan, S
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2004, 157 (04) : 164 - 171
  • [34] New Technical Developments - High Horsepower Agricultural Tractors New Operator Station, Track Suspension
    Wienkes, James W.
    Bowman, Dennis A.
    CONFERENCE: AGRICULTURAL ENGINEERING - LAND-TECHNIK AGENG 2009: INNOVATIONS TO MEET FUTURE CHALLENGES, 2009, 2060 : 15 - 19
  • [35] SIGNAL EDITING - A NEW APPROACH TO UPGRADE CONCATENATED CODING COMMUNICATIONS
    NG, WH
    NG, VC
    INTERNATIONAL JOURNAL OF SATELLITE COMMUNICATIONS, 1992, 10 (01): : 1 - 13
  • [36] When DNA puts ecological works back on the right track: genetic assessment and distribution patterns of mudsnail populations in the Evros Delta lagoons
    Kevrekidis, T
    Wilke, T
    Mogias, A
    ARCHIV FUR HYDROBIOLOGIE, 2005, 162 (01): : 19 - 35
  • [37] A Metric Approach for the Two-Station Single-Track Railway Scheduling Problem
    Cheng, T. C. Edwin
    Lazarev, Alexander
    Lemtyuzhnikova, Darya
    IFAC PAPERSONLINE, 2022, 55 (10): : 2875 - 2880
  • [38] A computer approach to overtaking station track layout diagram design using graphs. An alternative track diagram proposal for these stations
    Roanes-Lozano, Eugenio
    Galan-Garcia, Jose Luis
    Aguilera-Venegas, Gabriel
    JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2021, 391 (391)
  • [39] LONGITUDINAL TRACK-TRAIN DYNAMICS - NEW APPROACH
    GENIN, J
    GINSBERG, JH
    TING, EC
    MECHANICAL ENGINEERING, 1975, 97 (03) : 69 - 69
  • [40] New Approach to Arc Fitting for Railway Track Realignment
    Cellmer, Slawomir
    Rapinski, Jacek
    Skala, Marta
    Palikowska, Katarzyna
    JOURNAL OF SURVEYING ENGINEERING, 2016, 142 (02)