A BIM-Based construction and demolition waste information management system for greenhouse gas quantification and reduction

被引:71
|
作者
Xu, Jiuping [1 ,2 ]
Shi, Yi [1 ,2 ]
Xie, Yachen [3 ]
Zhao, Siwei [1 ,2 ]
机构
[1] Sichuan Univ, Business Sch, Chengdu 610064, Sichuan, Peoples R China
[2] Sichuan Univ, Uncertainty Decis Making Lab, Chengdu 610064, Sichuan, Peoples R China
[3] Michigan State Univ, Dept Geog, E Lansing, MI 48823 USA
关键词
Building information modeling; Construction and demolition waste; Greenhouse gas emissions; Information management system; LIFE-CYCLE ASSESSMENT; CARBON EMISSION; ENERGY; LANDFILLS; PROJECTS; CHINA;
D O I
10.1016/j.jclepro.2019.04.158
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Excessive greenhouse gas (GHG) emissions have caused serious global warming and climate change. As the construction and demolition waste (CDW) end of life disposal process is a source of GHG emissions, it is vital to precisely estimate and reduce CDW end of life GHG emissions. The precise estimation of CDW information is essential for GHG estimation and reduction. However, as current CDW information and associated GHG estimation methods tend to be inaccurate, in this paper, a building information modeling (BIM)-based CDW information management system (IMS) is constructed that provides precise CDW information and a detailed information estimation process. To facilitate the accurate quantification of CDW disposal GHG emissions, mathematical formulae that include several GHG emission factors are proposed. A practical case study from China is then given to demonstrate the efficiency and effectiveness of the proposed methodology in quantifying and reducing CDW disposal GHG emissions. Accurate GHG emission estimation are determined for fifteen CDW disposal types and a comparison are conducted. Concrete was found to have the highest carbon dioxide, methane, and nitrous oxide emissions during transportation and the highest carbon dioxide emissions during handling, and organics were found to have the highest decomposition methane emissions. Targeted suggestions are given for source-separated CDW disposal GHG emission reduction based on the different emission characteristics. The combination of the BIM -based CDW IMS and the developed mathematical formulae were found to efficiently and accurately determine the CDW information and the associated GHG emissions, and therefore provide a practical guide to reducing the serious environmental damage generated by CDW disposal. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:308 / 324
页数:17
相关论文
共 50 条
  • [31] CONSTRUCTION 3D BIM-BASED KNOWLEDGE MANAGEMENT SYSTEM: A CASE STUDY
    Lin, Yu-Cheng
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (02) : 186 - 200
  • [32] Research on BIM-based Construction Project Organization Interface Management
    Liu, Honglei
    Wang, Guangbin
    Zhang, Lei
    [J]. ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2781 - 2784
  • [33] Advantages and Implementation Steps of BIM-based Construction Project Management
    Li, Xiang
    Cao, Lei
    [J]. PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON ELECTRICAL & ELECTRONICS ENGINEERING AND COMPUTER SCIENCE (ICEEECS 2016), 2016, 50 : 441 - 444
  • [34] Platform Development of BIM-Based Fire Safety Management System Considering the Construction Site
    Yang, Yapin
    Sun, Ying
    Chen, Mingsi
    Zhou, Yuekuan
    Wang, Ran
    Liu, Zhengxuan
    [J]. BUILDINGS, 2022, 12 (08)
  • [35] BIM-based construction technology life-cycle management
    Zhang, L. D.
    Wang, G. J.
    [J]. 2015 3RD INTERNATIONAL CONFERENCE ON SOFT COMPUTING IN INFORMATION COMMUNICATION TECHNOLOGY (SCICT 2015), 2015, : 3 - 5
  • [36] The Identification, Development, and Evaluation of BIM-ARDM: A BIM-Based AR Defect Management System for Construction Inspections
    May, Kieran W.
    Chandani, K. C.
    Ochoa, Jose Jorge
    Gu, Ning
    Walsh, James
    Smith, Ross T.
    Thomas, Bruce H.
    [J]. BUILDINGS, 2022, 12 (02)
  • [37] BIM-based claims management system: A centralized information repository for extension of time claims
    Ali, Babar
    Zahoor, Hafiz
    Nasir, Abdur Rehman
    Maqsoom, Ahsen
    Khan, Rai Waqas Azfar
    Mazher, Khwaja Mateen
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 110
  • [38] A distributed BIM-based engineering project management information system design and analysis of advantage
    Wang, Guangbin
    Zheng, Xiaofei
    He, Jinbao
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2759 - +
  • [39] BIM-Based Maintenance Management System for Healthcare Facilities
    Kamal, Zahra
    Taghaddos, Hosein
    Karimi, Hossein
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2021, 35 (04)
  • [40] BIM-Based Automated Drainage System Design in Prefabrication Construction
    Zhang, Nan
    Tian, Yichen
    Wang, Jingwen
    Al-Hussein, Mohamed
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: COMPUTER APPLICATIONS, 2020, : 1146 - 1155