共 50 条
- [1] A due-date oriented scheduling heuristic for job shop cellular manufacturing system [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2000, 7 (01): : 76 - 88
- [2] Due-date oriented scheduling heuristic for job shop cellular manufacturing system [J]. Tsai, Chih-Hung, 2000, University of Cincinnati, Cincinnati, OH, United States (07):
- [4] A new heuristic algorithm for job shop scheduling [J]. ICIM' 2004: PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2004, : 191 - 196
- [5] Heuristic Algorithms for Fowline Cellular Manufacturing System Scheduling [J]. PROCEEDINGS OF THE 2018 IEEE 22ND INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN ((CSCWD)), 2018, : 779 - 784
- [6] A new heuristic operator for job shop scheduling problems [J]. 2006 10TH INTERNATIONAL CONFERENCE ON COMMUNICATION TECHNOLOGY, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1375 - +
- [8] Manufacturing job shop scheduling problems based on improved meta-heuristic algorithm and bottleneck identification [J]. Academic Journal of Manufacturing Engineering, 2020, 18 (01): : 98 - 103
- [9] A new heuristic algorithm for solving the job shop scheduling problem [J]. COMPUTATION IN MODERN SCIENCE AND ENGINEERING VOL 2, PTS A AND B, 2007, 2 : 1412 - 1416
- [10] A new heuristic method for job-shop scheduling problem [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 3708 - 3714