A High Performance Search Algorithm for Job-Shop Scheduling Problem

被引:6
|
作者
Wang, Shao-Juan [1 ]
Tsai, Chun-Wei [2 ]
Chiang, Ming-Chao [1 ]
机构
[1] Natl Sun Yat Sen Univ, Dept Comp Sci & Engn, Kaohsiung 80424, Taiwan
[2] Natl Chung Hsing Univ, Dept Comp Sci & Engn, Taichung 40227, Taiwan
关键词
Metaheuristic Algorithm; Job-Shop Scheduling Problem; Search Economics; GENETIC ALGORITHM;
D O I
10.1016/j.procs.2018.10.157
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
A novel metaheuristic algorithm, called search economics for job-shop scheduling problem (SEJSP), is presented to solve the job-shop scheduling problem (JSP) in this paper. The most distinguishing feature of the proposed algorithm is that it attempts to guide the search process to the regions that are promising, based on the expected value that is influenced by the performance of samples and candidate solutions and the developed rate of regions. Since SEJSP inherits the characteristics of search economics, it can also avoid the search from falling into local optima at early iterations. To evaluate the performance and effectiveness of the proposed algorithm and, this study compares SEJSP with other heuristics. The experimental results demonstrate that the proposed algorithm outperforms all the other heuristic algorithms compared in this study. (C) 2018 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:119 / 126
页数:8
相关论文
共 50 条
  • [31] Modified taboo search algorithm for the Job-Shop problem
    Tong, G.
    Li, G.Q.
    Liu, B.K.
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2001, 21 (09):
  • [32] Active solution space and search on job-shop scheduling problem
    Watanabe, Masato
    Ida, Kenichi
    Gen, Mitsuo
    [J]. Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi), 2006, 154 (04): : 61 - 67
  • [33] Active solution space and search on job-shop scheduling problem
    Watanabe, M
    Ida, K
    Gen, M
    [J]. ELECTRICAL ENGINEERING IN JAPAN, 2006, 154 (04) : 61 - 67
  • [34] TABU SEARCH FOR THE JOB-SHOP SCHEDULING PROBLEM WITH MULTIPURPOSE MACHINES
    HURINK, J
    JURISCH, B
    THOLE, M
    [J]. OR SPEKTRUM, 1994, 15 (04) : 205 - 215
  • [35] Solving nonstandard job-shop scheduling problem by efficient scheduling algorithm
    Wang, Feng-Ru
    Xu, Wei-Wen
    Xu, Hong-Fu
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2001, 7 (07): : 12 - 15
  • [36] Solving Job-shop Scheduling Problem by an Improved Genetic Algorithm
    Yang Yanli
    Ke Weiwei
    [J]. PRECISION ENGINEERING AND NON-TRADITIONAL MACHINING, 2012, 411 : 588 - 591
  • [37] Multiple colony ant algorithm for job-shop scheduling problem
    Udomsakdigool, A.
    Kachitvichyanukul, V.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (15) : 4155 - 4175
  • [38] Bilevel genetic algorithm for the flexible job-shop scheduling problem
    Zhang, Chaoyong
    Rao, Yunqing
    Li, Peigen
    Shao, Xinyu
    [J]. Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2007, 43 (04): : 119 - 124
  • [39] A heuristic algorithm for the distributed and flexible job-shop scheduling problem
    Mohsen Ziaee
    [J]. The Journal of Supercomputing, 2014, 67 : 69 - 83
  • [40] Application of Ant Colony Algorithm to Job-Shop Scheduling Problem
    Cao, Yan
    Lei, Lei
    Fang, Yadong
    [J]. PRECISION ENGINEERING AND NON-TRADITIONAL MACHINING, 2012, 411 : 407 - 410